61.2 Strengths & Weaknesses


                        Mega-project management skills

                        The  Corporation  is  able  to  handle  mega  Railway  and  construction  projects
                         because  of  its  vast  experience  in  special  engineering,  construction  and
                         management skills.

                        Efcient Train Operation

                        Daily on an average 55 nos. of passenger carrying trains plus 524 nos. of Holiday
                         Special Trains and 238 nos. of Festival Special Trains and 12 nos. of freight trains
                         including Roll on Roll off (RORO) services are run on the single line section and
                         punctuality performance is close to 80.45%.


                   61.3 Opportunities and Threats


                        Originating trafc is low. Passenger trafc on this line is very buoyant but the
                         goods trafc is mainly cross trafc loaded from other Zonal Railways. In order to
                         improve the originating trafc, the Corporation proposes to increase the container
                         services  and  undertake  port  connectivity  projects.  Corporation  has  also
                         undertaken Project Management Consultancy works.

                   61.4 Segment-wise and product wise performance
                                                                                                   (` In Crore)
                         Particulars                                2018-19     2019-20       % Variation

                         Trafc Earnings                            1256.07     1126.71        (10.29) %

                         Project Earnings                           1560.83     1501.56        (3.79) %

                         Total                                      2816.90     2628.27        (6.69) %



                   61.5 Future Outlook


                   61.5.1 Roha – Veer Doubling


                        This  section  includes  doubling  of  47  km,  which  in  turn  will  reduce  trafc
                         congestion and other savings like fuel, train punctuality etc.