C30 Shoring/ facade retention

  110 TERMS USED IN FAÇADE RETENTION
        • Definitions: As CIRIA Report, C579, 'Retention of masonry façades - best practice
            guide', Glossary and as follows:
             - Façade: The masonry structures that are to be kept in place, including external
               elevations, internal elevations and party walls listed as requiring support.
             - Retention structure: The temporary façade retention structure.

  120 RETENTION STRUCTURE GENERALLY
        • Extent of façade: site specific.
        • Nature of structure: site specific.
        • Position of structure: site specific.

  130 RAKING SHORESgenerally
        • Structure: Contractor's choice.
        • Foundations: Contractors choice.
        • Kentledge: Contractor's choice.
        • Connection to façade: Timber wall piece with cleats and needles at head of each
            shore.

  140 FLYING SHORESgenerally
        • Structure: Contractor's choice.
        • Connection to façade: Scaffold tube ties through openings with scaffold ledgers to
            each face.
        • Connection to existing supporting walls: Contractor's choice.

  150 RETENTION STRUCTUREgenerally
        • Structure: Contractor's choice.
        • Foundations: Contractor's choice.
        • Kentledge: Contractor's choice.
        • Connection to façade: Scaffold tube ties through openings with scaffold ledgers to
            each face.
        • Connection to existing supporting walls: Contractor's choice.
        • Other requirements: Protect structure from vehicle impact using steel safety barrier.

  180 TEMPORARY WORKS CO-ORDINATOR
        • Appoint: Suitably qualified and experienced person to co-ordinate the temporary
            works.
        • Responsibilities: To ensure that:
             - Relevant features of the façade, whether known at the outset or discovered in
               the course of the work, are fully considered in design and construction of
               retention structure.
             - Components of the design and detailing fit each other and the façade.
             - Required actions are only undertaken when it is safe to do so, and are carried
               out under supervision in accordance with design and relevant standards.
        • Period of appointment: From commencement of Contract until Retention structure
            has been dismantled.