Page 21 - McD_6118-AEW-XX-XX-NBS-A-001_Neat
P. 21

SYSTEM PERFORMANCE

210 RETENTION STRUCTURE DESIGN
      • Requirement: Design, erect and maintain retention structure to hold façade in
          position without overstress or undue deflection of façade or retention structure.
          - Additional requirements: Crash barrier to protect façade/ retention structure
             from vehicle impact, other; site specific.
      • Design parameters:
          - Spacing of supports (maximum): To prevent overstressing of masonry and restrict
             deflection under wind loading to distance between supports.
          - Loads: As specified.
          - Load combinations for strength: As CIRIA report C579, section 8.12.
          - Load combinations for lateral deflection: Dead loads, plus adverse imposed
             loads and, where applicable, earth loads plus adverse wind loads.
          - Lateral movement of façade (maximum): Restrict total movement due to load
             on retention structure and façade, plus thermal effects on retention structure to A
             t top of façade: Total height of façade to site specific point.
          - Factor of safety against overturning/ sliding: 1.5 for resistance against overturning
             and 2.0 for resistance against sliding.
      • Design standard: BS 5975.
          - Provisos: Imperfections for scaffold tubes assumed as BS EN 12811-1, clause
             10.2.2.2.
          - Substitution of alternative standards: Steelwork to BS 5950-1.
      • Design proposals: Submit detailed drawings and calculations. Resolve
          amendments before starting work.

230 RESPONSIBILITY
      • Requirement: Accept responsibility for adequacy, stability, integrity and rigidity of
          façade and retention structure for duration of works.

270 FOUNDATIONS AND KENTLEDGE
      • Requirements:
          - At façade end of retention structure: Provide new foundations and kentledge or
             demonstrate that existing structure can be used without distress to façade.
          - At outer end of retention structure: Contractor's choice.
          - Other requirements: Keying into façade for kentledge to be in existing openings
             or below ground level.
      • Ground investigation report: Confirm as adequate or submit proposals for further
          investigation as considered necessary.

280 CONNECTIONS BETWEEN FAÇADE AND SUPPORT STRUCTURE
      • Requirements:
          - Horizontal loads: To be transferred from façade to restraining structure without
             slip in compression or tension.
          - Differential vertical movement: Accommodate between façade and retention
             structure, without connection binding.

RotF generic (intermediate) NBS 2014  6118-AEW-XX-XX-NBS-A-01