P11 Foamed/ fibre/ bead cavity wall insulation

130 SURVEY OF EXISTING WALLS
      • Timing: Before starting insulation work.
      • Purpose: To confirm suitability for filling.
      • Report: Submit, stating:
          - Form of construction, materials used.
          - General condition of walls.
          - Thickness of walls.
          - Width and condition of cavity.
          - Exposure to wind driven rain.
          - Nature and extent of remedial work and other work required to ensure suitability.
          - Other information considered relevant.

140 REMEDIAL WORK TO EXISTING WALLS
      • Responsibility: Contractor .
      • Work to be carried out: As identified by the survey .
      • Approval: Obtain before starting insulation work.

170 SUITABILITY OF WALLS
      • Timing: Before and during filling of cavities.
      • Defects: Report immediately.

230 CAVITY FILL
      • Material: To be chosen by the Contractor.
          - Type: Currently certified as suitable for the purpose and exposure situation by the
             British Board of Agrément (BBA).
      • U value before installation: site specific.
      • Required U value after installation: site specific.
      • Recycled content: Submit proposals.
      • Installer: Approved in accordance with the BBA Surveillance Scheme.

310 GAPS AND OPENINGS
      • Gaps: Seal with tightly packed mineral wool to prevent loss of fill.
      • Openings: Fit approved sleeve to keep openings permanently clear.
      • Air bricks/ grilles of untrunked vents: Remove and seal openings into cavity.

320 INJECTION HOLES
      • Arrangement: Form neatly to a regular pattern and to sizes recommended by
          cavity fill manufacturer.
      • Before commencing filling of each wall: Form all holes in that wall.
      • Precautions: Avoid damage to dpcs, cavity trays, flues, etc.
      • Debris: Prevent from falling into cavity.

330 MAKING GOOD
      • Blockages: Remove from vents and refix or replace any air bricks.
      • Injection holes: Fill, replacing existing materials where possible.
          - Finished appearance: Obtain approval of first few holes before completing the
             remainder.