Page 39 - PA BOOKLET 2022
P. 39
RAMAGUNDAM (RDM) Kms. 274.25 Class " NSG 4 "
YARD DIAGRAM IS ATTACHED
I. STAFF STRENGTH II.(a). BUILDING - RESIDENTIAL
No. of Quarters (Type wise) Staff Strength Type I II III IV V Total
Department
I II III IV C D Available 167 173 16 8 - 364
Engineering 27 17 - 2 11 - Occupied 135 171 14 6 - 342
Operating 35 29 2 2 130 - Vacant 32 2 2 2 - 38
New
Commercial - - - - 18 - - - - - - -
Sanction
S & T 9 10 - - 15 - II.(b). BUILDING - SERVICE
Mechanical (C&W) 51 50 6 2 371 - Station Building 1
Office Building (ADEN, ALF, Electrical , RPF, Community,
Loco 13 35 3 - - 12
ESI,CTXR, PWI, IOW, Union and Sangh & Hindi Library )
Electrical (GS) 7 9 2 - 129 - Running Rooms 1
Electrical (TRD) 13 13 3 1 - Hospital 1
PSI 5 6 - - 1 - Officers Rest House 1
Medical 7 4 - 1 9 - Running Rooms, Retiring Rooms 2
Total 167 173 16 8 684 - Institute, Wlfare Center 2
III. WATER SUPPLY ARRANGEMENTS Pressure Filter Room 1
Total Demand (Lts) 489,000 ROH Shed, OHE Tower Car Shed, Diesel Trip Shed 3
i). Domestic (Lts) 364,000 Generator room & Cable Hut 2
ii). Service Buildings (Lts) 35,000 Cabins 2
iii). Carriage (Lts) 90,000 Up Platform Lavatory,DN PF Toilet 1
Source / Yield :- APGNCO Supply & Bore wels - 6 No's. Electrical & Loco Dormitory 2
IV. PASSENGER AMENITIES Laboratory room & Vaccum Room 2
1. Waiting Hall ( in Sqmts) 2nd Class 200
1st Class 120 5. Taps 68
2. Platform Shelter (in Sqmts) PF.No.1(HL) 3357 6. Lavatories 14
PF.No.2&3(HL) 2997 7. Urinals 10
8. Water Cooler 3
3. Platform Length (in Meters) PF.No.1 584.00 9. Foot Over Bridge 1
PF.No.2 & 3 583.60 10.Lifts 4
4. Benches (Seats) No's 570
V. PASSENGERS DETAILS
i). Number of Pass dealt per day (Nos.) 4121
ii). Maximum number of Passengers dealt at one time (Nos.) 172
iii). Average number of Outward Passengers dealt per day (Nos.) 2109
iv). Passenger earnings during the year 2021-22 (Rs.in Lakhs) 1313.52
2022-23
VI. No. OF PASSENGERS & EARNINGS OF THE STATION 2018-19 2019-20 2020-21 2021-22 (upto
Oct'22)
i). No. of Passengers 1236463 1151909 117822 494850 454319
ii). Passenger Earnings (in Lakhs) 1603.45 1643.79 566.88 1313.52 1107.83
iii). Other Coaching Earnings (in Lakhs) 43.89 48.74 27.21 52.84 40.79
iv). Goods Earnings (in Lakhs) 0.00 0.00 0.00 0.00 0.00
v). Sundries (in Lakhs) 9.03 14.03 14.03 17.03 18.56
Total 1656.37 1706.6 608.1 1383.4 1167.18
37