Page 107 - CRS Engineering
P. 107
Proforma for Joint Inspection on R. A. T.
For the Year 2020 -21
Description Remarks
SI
No
I General Particulars of RAT
1 Name of the tank Guntakindapalli Tank
2 District Chittoor District
3 Name of the Village and Mandal Guntakindapalli Village, Srikalahasti Mandal
4 Latitude & Longitude Lat 13° - 28' - 15" Long 79° - 39' - 11"
5 Affected Railway Bridge and Km The Tank Lies in-between Bridge No:-70&57 /
24-26
6 Railway section in between stations Yellakaru
7 Distance from Railway Bridge to weir 6.00 Kms from the Railway line to the tank.
( Along the Course of Nallah )
II Standard Hydraulic Details
1 Catchment Area 1.50 Sq miles
2 Capacity of the tank 40.14 MCFT
3 Lowest Bed Level +25.69 M
4 Full Tank Level ( F.T.L ) +30.01 M
5 Maxim Water Level ( M.W.L ) +30.38 M
6 Danger Level ( D.L ) +31.29 M
7 Top of Bund Level ( T.B.L ) +31.29 M , +32.11 M
8 Top Width of the Bund 1.20M, 3.00M ( Present Top Width )
9 Side Slopes AT FRONT:- 1 Va : 1 , AT REAR :- 2:1
10 Area of Submergence at FTL -
11 Area of Submergence at MWL -
12 Are there any tanks in the Catchment of NO
this tank
13 Are these tanks also classified as RATs -
14 Names and details of these tanks -
^Surplus Weir
III -
Number of Surplus Weirs ONE NUMBER ONLY ( 1 No Only )
1
Lengths of Surplus Weir 52.00 M
2
3 Tvoe of Surplus Weir B.C WEIR
4 Design Discharge b60.00 Cusecs
IV Sluices -
Number of Sluices FOUR NUMBERS ONLY ( 4 Nos Only )
1
Location of Sluices
2
Maximum designed discharge 2.50 CUSECS
3
4 Functional or not FUNCTIONAL
/ii) Tnicpection details
V
(^5-02-2020
)Date of Inspection
Designation ofthe Inspection 1) Sri. C. Willson Babu,
Assistant Divisional Engineer ,
South Central Railway
RENIGUNTA
2) Sri. C.Adinarayana Naidu, B.Tech..
Deputy Executive Engineer,
Irrigation Sub Division
3) Sri. K Rajesh,B.Tech.,
Assistant Executive Engineer ,
Irrigation Section
SRIKALAHASTI