Page 106 - CRS Engineering
P. 106

SI                   Description                                         Remarks
             No
                  iii) If tank quality for classification as RAT                          YES


                  B) Tank Bund
                  i) Is the top level of the bund uniform and                             Yes
                  as oer the standards?
                  ii) Is the top width of the bund as per                                 Yes
                  standards?
                  iii) Are the slopes as per the standards?                               Yes
                  iv) Any dangerous gullies or scour of the                              - NO -
                  hund?
                  C) Surplus Weir
                  i) Condition                                                           Good
                  ii) Is the Length adequate for Design                                    ~
                  discharae?
                  iii) Is Danger Level marked                                             Yes
                  D) Condition of the Sluices                             Damaged Sluice was reconstructed
                  E) Any Past history of Breach of the
                  tank if so, details.
















                          Assistant Executive Engineer,                      Deputy^/eci3tl>^e Engineer,
                                Irrigation Section,                             Irrigation Sub-Division,
                                 SRIKALAHASTI.                                     SRIKALAHASTI.










                                                                            Assistant Divisional Engineer,
                                                                                South Central Railway,
                                                                                     RENIGUNTA.
   101   102   103   104   105   106   107   108   109   110   111