Page 134 - CRS Engineering
P. 134
Proforma for Joint Inspection on R. A. T.
For the Year 2020 -21
s Description Remarks
No
General Particulars of RAT
1 Name of the tank Nachaneri tank
2 District Chittoor District
3 Name of the Village and Mandal Nachaneri Village, Yerpedu Mandal
Latitude & Longitude Lat 13° - 43' - 48" Long 79° - 35' - 27"
5 Affected Railway Bridge and Km Bridge No:-70, Location 57 / 24 - 26
6 Railway section in between stations Yerpedu - Rachagunneri.
7 Distance from Railway Bridge to weir
3.00 Kms from the Railway line to the tank.
( Along the Course of Nallah )
II Standard Hydraulic Details
Catchment Area 3.35 Sqmiles
2 Capacity of the tank 19.20 M.C.F.T
Lowest Bed Level +97.35M
1 Full Tank Level ( F.T.L ) + 100.OOM
5 Maxim Water Level ( M.W.L ) +100.60M
6 Danger Level ( D.L ) + 100.90M
7 Top of Bund Level ( T.B.L ) + 102.10M
8 Top Width of the Bund 3.00M ( Present Top Width )
9 Side Slopes AT FRONT:- 1 1/2 : 1 , AT REAR :- 2:1
10 Area of Submergence at FTL 1.98 sqkm
11 Area of Submergence at MWL 2.35 sqkm
12 Are there any tanks in the Catchment of NO
13 Are these tanks also classified as RATs -
14 Names and details of these tanks -
III Surplus Weir -
1 Number of Surplus Weirs 1 No OIny
2 Lengths of Surplus Weir 1)20M
3 Type of Surplus Weir B.C WEIR
4 Design Discharge 60Cusecs
IV Sluices
4 Nos ( 4Nos Only )
1 Number of Sluices
AT 390,535m,760m,1015m
2 Location of Sluices
3 Maximum designed discharge 2.50 CUSECS
Sluice 3 is in damaged condition and it is to be
4 -unctional or not
V A) Inspection details
,SS-02-2020
)Date of Inspection
i)Name& Designation of the inspection 1) Sri. C. Willson Babu,
Assistant Divisional Engineer,
South Central Railway
RENIGUNTA
2) Sri. C.Adinarayana Naidu, B.Tech..
Deputy Executive Engineer,
Irrigation Sub Division
3) Sri. K. Harikrishna
Assistant Engineer,
Irrigation Section
YERPEDU