Page 139 - CRS Engineering
P. 139

iii) If tank quality for classification as RAT                        YES


                  B) Tank Bund
                  i) Is the top level of the bund uniform and                            YES
                  as oer the standards?
                  ii) Is the top width of the bund as per                                YES
                  standards?
                  iii) Are the slopes as per the standards?                             YES
                  iv) Any dangerous gullies or scour of the                              No
                  bund?
                  C) Surplus Weir
                  i) Condition                                                          Good
                  ii) Is the Length adequate for Design                                  Yes
                 discharoe?
                  iii) Is Danger Level marked                                           Yes,
                  D) Condition of the Sluices                                           Good
                  E) Any Past history of Breach of the                                    -
                 tank if so. details.
                 C) i)                                                     Surplus weir is reconstructed










                                                        rP


                              Assistarrt Engf                               Deputy'^x^cu^fvfe Engineer,
                                Irrigation Section,                           Irrigation Sub-Division,
                                    YERPEDU                                       SRIKALAHASTI.









                                                                           Assistant Divisional Engineer,
                                                                              South Central Railway,
                                                                                    RENIGUNTA.
   134   135   136   137   138   139   140   141   142   143   144