Page 143 - CRS Engineering
P. 143
iii) If tank quality for classification as RAT YES
B) Tank Bund
i) Is the top level of the bund uniform and YES
as oer the standards?
ii) Is the top width of the bund as per YES
standards?
iii) Are the slopes as per the standards? YES
iv) Any dangerous gullies or scour of the No
bund?
C) Surplus Weir
i) Condition Surplus weir is completely in Dilapidated
condition,it to be Reconstructioned Immedately
ii) Is the Length adequate for Design Yes
discharae?
iii) Is Danger Level marked Yes,
D) Condition of the Sluices Good
E) Any Past history of Breach of the -
tank if so, details.
C) i) surplus weir is to be Reconstructed.
lpb>
Assistartf Engineer, Deputy'Ex^^cutTv'e E'ngineer,
Irrigation Section, Irrigation Sub-Division,
YERPEDU SRIKALAHASTI.
Assistant Divisional Engineer,
South Central Railway,
RENIGUNTA.