Page 145 - CRS Engineering
P. 145
iii) If tank quality for classification as RAT YES
B) Tank Bund
i) Is the top level of the bund uniform and YES
as oer the standards?
ii) Is the top width of the bund as per YES X
standards?
iii) Are the slopes as per the standards? YES
iv) Any dangerous gullies or scour of the No ^
hund?
C) Surplus Weir
i) Condition Good
ii) Is the Length adequate for Design Yes
discharoe?
iii) Is Danger Level marked Yes,
D) Condition of the Sluices Sluice N0.2&3 is to be Reconstructed.
E) Any Past history of Breach of the No
tank if so, details.
D) Sluice N0.2&3 is to be Reconstructed.
2i>h0
Assistarrt Engineer, Deput Engineer,
Irrigation Section, Irrigation Sub-Division,
YERPEDU SRIKALAHASTI.
^O/'
Assistant Divisional Engineer,
South Central Railway,
RENIGUNTA.