Page 149 - CRS Engineering
P. 149

iii) If tank quality for classification as RAT                         YES

                 B) Tank Bund
                 i) Is the top level of the bund uniform and                            YES
                 as oer the standards?
                 ii) Is the top width of the bund as per                                YES
                 standards?
                 iii) Are the slopes as per the standards?                              YES
                 iv) Any dangerous gullies or scour of the                              No
                 bund?
                 C) Surplus Weir
                 i) Condition                                                          Good
                 ii) Is the Length adequate for Design                                  Yes
                 discharae?
                 iii) Is Danger Level marked                                           Yes,
                 D) Condition of the Sluices                                           Good
                 E) Any Past history of Breach of the                                   No
                 tank if so, details.
                 D)                                                        Surplus weir is Reconstructd













                              Assistant Enginee                            Deputy"Executive Engineer,
                               Irrigation Section,                           Irrigation Sub-Division,
                                   YERPEDU                                       SRIKALAHASTI.








                                                                          Assistant Divisional Engineer,
                                                                             South Central Railway,
                                                                                   RENIGUNTA.
   144   145   146   147   148   149   150   151   152   153   154