Page 151 - CRS Engineering
P. 151
iii) If tank quality for classification as RAT YES
B) Tank Bund
i) Is the top level of the bund uniform and YES
as oer the standards?
ii) Is the top width of the bund as per YES
standards?
iii) Are the slopes as per the standards? YES
iv) Any dangerous gullies or scour of the No
hund?
C) Surplus Weir Damagedu
i) Condition Damagedu and it is to be Reconstruction
Immediately
ii) Is the Length adequate for Design Yes
discharae?
iii) Is Danger Level marked Yes,
D) Condition of the Sluices
E) Any Past history of Breach of the No
tank if so, details.
D) Surplus weir is Reconstructd
Assistant Engineer, Deputy Executive Engineer,
Irrigation Section, Irrigation Sub-Division,
YERPEDU SRIKALAHASTI.
7^
20/i_
Assistant Divisional Engineer,
South Central Railway,
RENIGUNTA.