Page 153 - CRS Engineering
P. 153
iii) If tank quality for classification as RAT YES
B) Tank Bund
i) Is the top level of the bund uniform and YES
as oer the standards?
ii) Is the top width of the bund as per YES
standards?
iii) Are the slopes as per the standards? YES
iv) Any dangerous gullies or scour of the No
bund?
C) Surplus Weir
i) Condition surplus weir is to be Reconstructd
ii) Is the Length adequate for Design Yes
discharae?
iii) Is Danger Level marked Yes,
D) Condition of the Sluices -
E) Any Past history of Breach of the No
tank if so, details.
D) Surplus weir is to be Reconstructd and Sluices
No.2 is Damagd condition and it is also to be
Rprnnstruced
AssistOTc Engineer, Deputf^)^ci/6ve Efigineer,
Irrigation Section, Irrigation Sub-Division,
YERPEDU SRIKALAHASTI.
r
Assistant Divisional Engineer,
South Central Railway,
RENIGUNTA.