Page 141 - CRS Engineering
P. 141
iii) If tank quality for classification as RAT
YES
B) Tank Bund
i) Is the top level of the bund uniform and
YES
as oer the standards?
ii) Is the top width of the bund as per YES
standards?
iii) Are the slopes as per the standards? YES
iv) Any dangerous gullies or scour of the
No
bund?
C) Surplus Weir
i) Condition Good
ii) Is the Length adequate for Design Yes
discharae?
iii) Is Danger Level marked Yes,
D) Condition of the Sluices Good
E) Any Past history of Breach of the
-
tank if so, details.
C) i)
Assistant Engineer^ Deputy'^x^culWe Engineer,
Irrigation Section, Irrigation Sub-Division,
YERPEDU SRIKAi-AHASTI.
7M,
'
Assistant Divisional Engineer,
South Central Railway,
RENIGUNTA.