Page 135 - CRS Engineering
P. 135
iii) If tank quality for classification as RAT YES
B) Tank Bund
i) Is the top level of the bund unifornn and YES
as oer the standards?
ii) Is the top width of the bund as per YES
standards?
iii) Are the slopes as per the standards? YES
iv) Any dangerous gullies or scour of the No
bund?
C) Surplus Weir
i) Condition Surplus weir is reconstructed
ii) Is the Length adequate for Design Yes
discharae?
iii) Is Danger Level marked Yes,
D) Condition of the Sluices Sluice no.3 to be Reconstructed
E) Any Past history of Breach of the - NO -
tank if so, details.
C) i) Surplus weir and sluice is to be reconstructed
TPIP
Assistant tngineer) Deputy*Ex§cufrv6 Engineer,
Irrigation Section, Irrigation Sub-Division,
YERPEDU SRIKALAHASTI.
7^
/a
Assistant Divisional Engineer,
South Central Railway,
RENIGUNTA.