Page 172 - Mines Facilities Plan
P. 172
PLANNED FAR 1.06 0.13 0.61 0.73 0.31 0.12
EXISTING FAR 0.55 0.13 0.31 0.05 0.14 0.07
PLANNED TOTAL BUILDING GSF 2,527,066 212,638 1,141,920 493,425 523,715 37,626
DEMO BUILDING GSF (54,765) – – (34,208) – –
NEW BUILDING GSF 1,237,333 10,261 559,520 493,425 282,500 15,500
Campus by replacing surface parking lots and smaller one-story buildings with
by recreational, parking, office, and housing uses that are second only to the
oor area EXISTING TOTAL BUILDING GSF 1,344,498 202,377 582,400 34,208 241,215 22,126
ratio) is on South Campus, where largely surface parking lots are replaced
The Main Campus is compact, resulting in a highly walkable environment.
The master plan intensifies the building density of the core of the Main
The most significant change in building density (as measured by fl
EXISTING SITE GSF 2,387,982 1,600,412 1,864,335 678,880 1,673,869 313,157
55 37 43 16 38 7
EXISTING ACREAGE
BUILDING DENSITY ZONES
Colorado School of Mines Facilities Master Plan
multiple-story buildings. academic core in density. ZONE Main Campus – Academics Main Campus – Athletics Main Campus – Residential Main Campus – South Campus Mines Park – Residential Mines Park – Facilities 166