Page 424 - Mines Facilities Plan
P. 424

&RQGHQVDWH    *30





                   (VWLPDWHG   6WHDP /RDG    /%6 +




                   (VWLPDWHG   6WHDP 8VDJH   %78 + 3HU 6)


              STEAM: ESTIMATED EXISTING LOAD SUMMARY
                   *URVV %XLOGLQJ   $UHD   *6)   5(6($5&+ 3$5.                                                         :(67 &$0386                                                                                             &(175$/ &$0386                                                                                                                                             ,1129$7,21 +8%










                     %XLOGLQJ 1DPH                  %HQ +  3DUNHU 6WXGHQW &HQWHU (DVW %HQ +  3DUNHU 6WXGHQW &HQWHU :HVW  *HQHUDO 5HVHDUFK /DE  *5/   (VWLPDWHG /RDG 7RWDO  /%6 +  (VWLPDWHG 6WHDP 'LYHUVLW\ (VWLPDWHG 3HDN 'HPDQG  /%6 +






                          86*6 ,  $OGHUVRQ +DOO  0DUTXH] +DOO  &7/0  &3   8QLW 2SV  6XEWRWDO  6WDU]HU :HOFRPH &HQWHU  :HDYHU 7RZHUV  (OP 5HVLGHQFH +DOO  0DSOH +DOO  %URZQ +DOO  %HUWKRXG +DOO  &RRUV7HN &$6(  5HFUHDWLRQ &HQWHU   6XEWRWDO  /DNHV /LEUDU\   *XJJHQKHLP +DOO  9RON *\PQDVLXP  6WHLQKDXHU )LHOG +RXVH  (QJLQHHULQJ +DOO  &KDXYHQHW +DOO  *UHHQ &HQWHU  +LOO +DOO   &RROEDXJK +DOO  6WUDWWRQ +DOO  5DQGDOO +DOO  7KRPDV +DOO  %UDGIRUG +DOO  0RUJDQ +DOO  &3   +HDWLQJ 3ODQW  6XEWRWDO  6X



                           Street west to the CoorsTek building will be replaced with a 10” pipe. This
                                              extended to serve the new Spruce Hall (Residence Hall VI) and then will
               The existing 8” steam line that runs down Cheyenne Street from midway
                                  The existing 6” steam pipe that runs down Maple Street from 16th Street
                 between 13th Street and 14th Street to 16th Street will be upgraded to a
                                                 be extended to the intersection of 18th Street and Illinois Street. These
                        The existing 6” steam pipe that runs from 16th Street and Cheyenne




                                                                                                                      
                    14” pipe. This is anticipated to be completed in 2019.





                              is anticipated to be completed in 2019. to Brown Hall will be upsized to a 10” pipe. This is anticipated to be   completed in 2020. 5. The 6” steam line at the corner of 18th Street and Maple Street will be   two additions are anticipated to be completed in 2019.  STEAM DIVERSITY Through meetings with Facilities Management and review of limited metered  data, SBEC understands that the existing heating plant does not currently  operate at full capacity. M




















               2.       3.        4.                                                                                  418
   419   420   421   422   423   424   425   426   427   428   429