Page 12 - Bernardon Proposal-Village Place Apartments Interior Design
P. 12

www.bernardon.com













                 Phase III - Construction Documents                 Landscape Architecture Additional Services and
                    ■ Prepare layout and dimension plans of landscape and   Exclusions
                   hardscapes;                                      Our services are limited to the Scope of Basic Services
                    ■ Prepare specifications and layout of proposed site   described above.  If the scopes of the project or our services
                   amenities;                                       change, we reserve the right to invoice for Additional
                    ■ Construction details for all hardscapes, planters, and   Services.  Examples of Additional Services would include:
                   walls;
                    ■ Final specification and selection of all hardscape     ■ Revising previously approved drawings;
                   materials; and                                        ■ Pool design and documentation;
                    ■ Final specification and selection of all site furnishings     ■ Planting Plans;
                   such as bollards, benches, light fixtures, waste      ■ Entitlement support and township/public meetings;
                   receptacles, and precast planters.                   and
                                                                         ■ Additional construction observations.
                 Phase IV - Construction Administration
                 Construction Administration services can be provided   Optional Service - Record Drawings
                 upon request by the owner on an hourly basis. Services   Bernardon  can provide  Record Drawings,  if  required.
                 may include:                                       Your Construction Manager shall maintain, at the site for

                                                                    the Owner, one (1) copy of the drawings, specifications,
                    ■ Answer RFIs during the subcontractor bid period;  addenda, change orders, and other modifications in good
                    ■ Attend one (1) pre-construction meeting;      order and marked currently to indicate field changes and
                    ■ Attend on-site construction observation meetings;  selections made during construction and one (1) copy
                    ■ Review specific shop drawings; and            of approved shop drawings, product data, samples and
                    ■ Punch list review of the exterior amenity area and   similar required submittals.  These shall be available to
                   courtyard.                                       the Interior Designer and shall be digitally delivered to
                                                                    the Interior Designer in PDF form for submittal to the
                 Phase V - Courtyard Furniture, Fixtures &          Owner upon completion of the work as a record of the
                 Equipment (FF&E)                                   work as constructed.  Bernardon will base the record
                    ■ One (1) initial meeting to present selected furniture,   drawings on this information only.
                   fabrics, and accessories for approval;
                    ■ One (1) follow-up meeting to present for approval the   Interior Design Record Drawings:   $  6,000.00
                   requested changes to selected furniture, fabrics, and
                   accessories;
                    ■ Tagged furniture and artwork location plans;  If additional existing survey work is required, we will
                                                                    invoice that time as hourly service, at our standard rates,
                    ■ Technical furniture and accessory specifications (book   which are adjusted annually.
                   format);
                    ■ Coordination of specifications to be quoted by
                   Bernardon Procures, LLC;
                    ■ Serving as vendor liaison coordinating the construction
                   schedule and the furniture and accessory delivery and
                   installation;
                    ■ Provide on-site placement coordination and review
                   during installation of FF&E; and
                    ■ Provide final punch list for FF&E.



               BERNARDON | Proposal for Interior Design Services
               CHPVP Phase 3, LLC (Entity 369) | Village Place Apartments, Building 5 | February 15, 2022  Page 9
   7   8   9   10   11   12   13   14   15   16   17