Page 6 - Bernardon Proposal-Berwyn Fire Company Station 2
P. 6

www.bernardon.com












               have each established themselves as experts in their   Scope of Basic Services
               respective fields, and we have determined through
               our successful relationship with them that they share
               Bernardon’s service-oriented philosophy and core values.
                                                                  Phase I – Schematic Design

                     ■ To provide the highest level of client service in a
                    team atmosphere based upon  communication,    Upon receiving your notice to proceed, we will convene
                    cooperation, and collaboration;               a meeting with BFC and the project design team
                     ■ To develop designs that reflect  values and   including BFC’s Civil Engineer.  The purpose of this
                    mission of our clients;                       meeting shall be to review the conceptual design that
                     ■ To provide options to our clients via a very   we prepared as part of the conceptual design services
                    interactive approach that explores multiple   to confirm the programmatic needs are being met,
                    design solutions;                             to identify any known challenges with the site, and
                     ■ To incorporate  sustainability in our design   to discuss the preferred and recommended building
                    wherever possible; and                        systems.  Following this meeting, the design team will
                     ■ To recognize at all times the  importance of   advance the Schematic Design of the building design
                    project cost and schedule.                    and the design of the building systems.

               Our design team is experienced in designing with   The following services and documents are included as
               materials that are sustainable, recycled, recyclable,   part of this phase:
               or renewable.  Although we  will incorporate building
               technologies and systems that reduce overall
               energy consumption, reduce negative impacts to          ■ Design services as described above.
               the environment, and promote healthy indoor             ■ A code review summarizing the requirements
               environments, we have not included third-party         of  the  governing  codes including  the  2015
               validation of environmentally responsible initiatives,   International Building Code and the 2010 ADA
               such as USGBC’s LEED Rating System, Energy Star,       Standards for Accessible Design.
               Green Globes Certification, and Living Building         ■ Schematic Design documents including floor
               Challenges, as part of this proposal.                  plans, reflected ceiling plans, and building
                                                                      elevations of the key facades.  The building
               We understand BFC will engage a civil engineer to      elevations will be captured from the SketchUp
               perform civil engineering and land surveying services   model,  and  we  will  prepare  one  (1)  updated
               related to the preparation of construction plans.  We   perspective for your use.
               also recommend that you engage a utility locator        ■ Description of the typical exterior wall
               consultant and a geotechnical consultant to confirm the   assemblies.
               soil bearing and underlying conditions, recommended
               foundation system, and seismic site coefficient prior to     ■ Structural system Basis-of-Design narrative.
               the structural system design.                           ■ MPEFP systems design.










               BERNARDON | Proposal for Professional Design Services
               Berwyn Fire Company Station 2 | September 1, 2021                                               Page 4
   1   2   3   4   5   6   7   8   9   10   11