Page 7 - Bernardon Proposal-Berwyn Fire Company Station 2
P. 7

www.bernardon.com












                     ■ Prepare a budgetary estimate of construction     ■ Design and develop structural framing and
                    through the engagement of a respected General    foundation building plan drawings that will
                    Contractor who will also be given the opportunity   include column locations and orientation,
                    to participate in the bidding of the Work.       braced bays and beam sizes along with the
                                                                     building foundation type and sizes based on the
               We have included a total of three (3) Schematic       geotechnical investigations provided by others.
               Design meetings with you to review the progress and     ■ Prepare design development drawings for MPEFP
               development of the design and to gain your approval   systems to establish and describe the size and
               to proceed to the Design Development phase.           character of the systems and to allow coordination
                                                                     with other disciplines.  Included in this scope of
                                                                     work will be:
               Phase II – Design Development                             o Final load calculations for all systems and
                                                                        zones.
               Upon receiving your notice to proceed with this           o Final sizing of all major MEP equipment
               phase, we will begin to refine the design in terms of    rooms, duct, and pipe chases.
               aesthetics, functional requirements, interior and         o Establishment of service clearances.
               exterior finishes, materials, and building systems.       o Coordination with site utility drawings.
               Additionally, we will be coordinating our architectural     ■ Prepare an Estimate of Probable Construction
               and interior design services with those of our        Cost through the engagement of a respected
               engineering consultants in order to identify and      General  Contractor  who  will also be  given  the
               integrate the requirements of the structural MPEFP    opportunity to participate in the bidding of the
               systems into the design of the facility.              Work.


               The following services and documents are included as   We have included a total of two (2) Design Development
               part of this phase:                                meetings with you to review the development of the
                                                                  design  and to gain  your approval to proceed to  the
                    ■ Design services as described above.         Construction Documents phase.  We have included
                    ■ Prepare Design Development drawings including   two (2) interior finishes review meetings with you.
                   floor plan, roof plan, elevations, and sections as
                   required to describe the scope of the project.  Once  we  have  received  a  written  approval  of  our
                    ■ Develop building sections and typical wall   Design Development phase and authorization to
                   sections and description of the building envelope   proceed from you, we will proceed to Phase III -
                   assemblies.                                    Construction Documents.
                    ■ Interior design and finish selections.  Finish
                   selections will include flooring materials, paints,
                   laminates, and wall and ceiling materials.
                    ■ Prepare an interior finish schedule.








               BERNARDON | Proposal for Professional Design Services
               Berwyn Fire Company Station 2 | September 1, 2021                                               Page 5