Page 23 - Bernardon Response to RFP-Chestnut Run Campus Master Plan
P. 23

www.bernardon.com
                                                                AFTER































































                                                  BEFORE
            of the new headquarters would not be able to navigate freely
            within the existing two-building structure, so an addition
            was designed to turn the two disjointed buildings into one
            seamless structure.

            To maximize the use of the site’s natural features and give
            Saint-Gobain the desired outdoor amenities, exterior design
            features were added including a terrace at the main entry level
            with a canopy and an open-air amphitheater with a beautiful
            cascading fountain. The design team also reinvigorated an
            existing pond with a new adjacent patio and enhanced at
            least 1.3 miles of existing walking trails that circulate the
            surrounding woods, providing

            BERNARDON | Response to Request for Proposals | MRA Group
            Chestnut Run Innovation & Science Park | Campus Concept Master Plan | June 14, 2021            Page 17