                    •  Roof plan and associated details.              ■ Respond to comments from the building plans
                    •  Elevations, sections, and details with         examiner.
                       keynotes.                                      ■ We will provide shop drawing review and
                    •  Details of building storefront, entrances,     processing of architectural, structural, and MPEFP
                       and window details.                            components required by the contract documents.
                    •  Schedule for doors, frames, and hardware.      One (1) review of each required submittal plus
                    ■ The structural engineer will prepare drawings   one (1) follow-up review is included provided the
                    that will represent the design of the footings    submittal is made in accordance with the contract
                    and foundations, tilt-up concrete wall panels,    documents.  The following shop drawings and
                    and details as required to communicate the        submittals will be reviewed:
                    primary building framing system.                  •  Concrete wall panels (architectural features).
                    ■ Provide construction documents of the           •  Miscellaneous metals (roof ladder, railings,
                    MPEFP systems.                                       steps).
                    ■ Prepare COMcheck Compliance Certificates.       •  Roofing.
                    ■ Participate in coordination meetings or         •  Aluminum and glazing systems.
                    conference calls to review the progress of the    •  Doors, frames, and hardware.
                    drawings.                                         •  Dock equipment.
                    ■ Coordinate our services with those of the       •  Structural components.
                    Owner’s consultants.                              •  Mechanical, plumbing, and electrical
                    ■ Provide signed and sealed drawings for use in      components.
                    the building permit application process.          ■ Answer contractor Requests for Information
                                                                      (RFIs).  We have included a budget of fifty (50)
                                                                      hours per building for this service.
               Phase 4 – Bidding and Construction Contract            ■ Bernardon will attend a total of ten (10) on-
               Administration (Limited Scope)                         site construction progress meetings, generally
                                                                      on a monthly basis, to observe the progress of
               Bidding and award will be managed by BTC III, I-95     the work and to answer questions regarding
               Logistics Center, LLC’s construction team.  Bernardon   the construction.  The structural engineer will
               and its consultants will respond via addenda to questions   visit the site one (1) time for each building.  The
               during the bidding period regarding the construction   MPEFP engineer has not included any site visits
               documents and design intent.                           during construction.


               We have assumed the buildings will be constructed   Please note that it is our goal to maintain flexibility in
               concurrently and the construction period will be   the performance of our services during this phase and
               approximately eight (8) to twelve (12) months.  During   render the most appropriate level of service.  We can
               the Construction Contract Administration phase of the   modify our scope of services upon your request with an
               project, we will provide the following services:   adjustment in compensation.








               BERNARDON | Response to Request for Proposals for Architectural & Engineering Services      Page 7
               BTC III, I-95 Logistics Center, LLC | Abingdon Business Park, Harford County, MD | September 20, 2021
   5   6   7   8   9   10   11   12   13   14   15