• Roof plan and associated details. ■ Respond to comments from the building plans
• Elevations, sections, and details with examiner.
keynotes. ■ We will provide shop drawing review and
• Details of building storefront, entrances, processing of architectural, structural, and MPEFP
and window details. components required by the contract documents.
• Schedule for doors, frames, and hardware. One (1) review of each required submittal plus
■ The structural engineer will prepare drawings one (1) follow-up review is included provided the
that will represent the design of the footings submittal is made in accordance with the contract
and foundations, tilt-up concrete wall panels, documents. The following shop drawings and
and details as required to communicate the submittals will be reviewed:
primary building framing system. • Concrete wall panels (architectural features).
■ Provide construction documents of the • Miscellaneous metals (roof ladder, railings,
MPEFP systems. steps).
■ Prepare COMcheck Compliance Certificates. • Roofing.
■ Participate in coordination meetings or • Aluminum and glazing systems.
conference calls to review the progress of the • Doors, frames, and hardware.
drawings. • Dock equipment.
■ Coordinate our services with those of the • Structural components.
Owner’s consultants. • Mechanical, plumbing, and electrical
■ Provide signed and sealed drawings for use in components.
the building permit application process. ■ Answer contractor Requests for Information
(RFIs). We have included a budget of fifty (50)
hours per building for this service.
Phase 4 – Bidding and Construction Contract ■ Bernardon will attend a total of ten (10) on-
Administration (Limited Scope) site construction progress meetings, generally
on a monthly basis, to observe the progress of
Bidding and award will be managed by BTC III, I-95 the work and to answer questions regarding
Logistics Center, LLC’s construction team. Bernardon the construction. The structural engineer will
and its consultants will respond via addenda to questions visit the site one (1) time for each building. The
during the bidding period regarding the construction MPEFP engineer has not included any site visits
documents and design intent. during construction.
We have assumed the buildings will be constructed Please note that it is our goal to maintain flexibility in
concurrently and the construction period will be the performance of our services during this phase and
approximately eight (8) to twelve (12) months. During render the most appropriate level of service. We can
the Construction Contract Administration phase of the modify our scope of services upon your request with an
project, we will provide the following services: adjustment in compensation.