               Project Approach


               Project Understanding                              This proposal is for the shell building only.  Tenant
                                                                  specific fit-out improvements such as office areas,
               BTC III, I-95 Logistics Center, LLC has commenced   shipping offices, toilet rooms, battery charging, etc.,
               preparations for a site development project for Abingdon   are not included.  We have included an Optional Service
               Business Park located between Route 24 and Abingdon   to provide programming, conceptual design, and
               Road in Harford County, Maryland.  The site development   construction documents for a typical 4,000 to 6,000
               work  will  consist  of  the  construction  of  a  new  road   square foot tenant.
               extension and bridge and the preparation of Lots 1, 2,
               and 3 that will accommodate the vertical construction   It is your goal to include sensible, cost-effective,
               described  in  this  proposal.    The  first  phase  of  vertical   environmentally responsible design strategies.  However,
               construction will include four (4) new freestanding   we  understand  the  project  will  not  seek  third-party
               warehouses totaling 2,064,800 square feet.         validation of environmentally  responsible initiatives,
                                                                  such as USGBC’s LEED Rating System, Energy Star, Green
               Building 1 is a cross-dock warehouse building of   Globes Certification, and Living Building Challenges
               approximately 1,008,000 square feet and is located on   as part of the Basic Services outlined in our proposal.
               Lot 1. Building 2, located on Lot 2, is characterized as a   If this were to change, we can provide the design and
               606,480 square foot cross-dock warehouse.  Lot 3 will   administrative services associated with certification as
               accommodate Building 3A and Building 3B.  These two   Additional Services.
               (2) new front-load warehouse buildings are configured
               along a shared truck court and are 301,600 square feet   We have assumed that in each phase, the services outlined
               and 148,720 square feet respectively.  The buildings will   will run concurrently for all buildings.  We have included
               be designed to have one (1) to four (4) corner entrances.  the development of four (4) separate sets of permit
                                                                  drawings, one (1) for each building.  We understand all
               The clear height, as measured at the speed bay side of   buildings will be awarded to a single design team.
               the first column line, is represented as being 40 feet for
               Buildings 1 and 2, and 36 feet and 32 feet for Buildings
               3A and 3B respectively.  Interior improvements will be
               limited to an electrical room and sprinkler room.  The
               building will have conventional spread footings, tilt-up
               concrete bearing wall panels, and conventional steel
               frame.  The roof will be a 60-mil black EPDM membrane
               on rigid insulation on metal deck.  We have assumed all
               buildings will have similar design relative to appearance
               and construction methods.  We will design one building
               with entrances and use that design as the basis for the
               other building designs, making adjustments for bay
               spacing and clear height.








               BERNARDON | Response to Request for Proposals for Architectural & Engineering Services      Page 5
               BTC III, I-95 Logistics Center, LLC | Abingdon Business Park, Harford County, MD | September 20, 2021