I. In consultation with LMC’s legal counsel,
Bernardon will review local zoning ordinances
and building codes to identify where variances
may be required for the implementation of the
proposed master plan design.
J. Provide order of magnitude construction cost
input for each program/building developed in
the space planning process. Collaborate with
Owner, Project Manager, and Construction
Manager through budget development to
reach final target construction budget.
Master Planning Report 4. Project Narrative shall provide supporting
documents by consultants not directly
A. Assemble any previous design documents
including but not limited to plans, elevations, contracted by Architect.
building sections, etc., that convey the intent 5. Revise the project narrative to include
of the Project. Supplement the previous Owner’s comments on initial project
documents with any additional information narrative.
that describes the intent of the Project.
6. The final Report document shall include:
B. Provide Project Narrative:
■ Final Project Narrative;
1. The Narrative shall set forth the final scope ■ Space Program (in format reviewed
decision made during the design process to and approved by owner);
date. ■ Previous Drawings (if applicable);
■ Medical Equipment List;
2. The Narrative shall include the basic
explanation of design elements needed to ■ Any new supporting drawings and
construct each component of the master diagrams;
plan. This will include architectural design ■ Conceptual Budgeting information;
elements and requirements, and MEP and
systems descriptions and requirements. ■ List of “open issues” to be resolved
and/or responded to by the Owner
3. That Narrative shall be used as the basis covering specific elements of the
of design for the initial conceptual level master plan that require Owner input
pricing and budgeting of the Master Plan and/or direction for moving into
elements. the conceptual design phase of the
project.