Page 492 - PERSIAN 9 1941_1947
P. 492

-4-

                 6. MUNICIPALITIES.

                             The work of the municipalities was confined
                 to routine matters and no important projects were
                 Instituted.
                 7. PUBLIC WORKS.
                             Ko new major works were carried out during
                 this year.

                 8. ELECTRICITY DEPARTMENT.
                         (a) The new generating set of 206 KW capacity
                 arrived in Bahrain in March, 1945, but the extension
                 of the power House having proceeded little beyond the
                 stage of planning and the engine having arrived minus
                 certain essential parts, the plant was not in operation
                 by the end of the year and the three overworked and long
                 enduring British sets catered very spasmodically for the
                 needs of the hard tried and perspiring population of
                 Bahrain during a very unpleasant hot weather.
                             VTere it not that the R.A.F.*s plant at
                 .Muharraq came into operation on the 1st June and thereby
                 released the Government power House of about 100 KV/ of
                 their load the situation would have been even worse than
                 it was. Consumers were, during the hot weather, cut off
                 daily at regular (sic) intervals and the total period
                 during which supply was proportioned was as follows
                             A & C Feeders          264 hrs. 11 Minutes.
                            Royal Naval Base,
                                    Jufair          233    "   8
                            Beigrave Feeder         196    "  49
                            Bazaar Feeder            73    "  30
                 Muharraq, which has its own feeder, was cut off for a
                 total of 18 hrs. 37 minutes.
                            The total period of shutdowns for mechanical
                 defects was 786 hrs. 15 minutes during the months
                April/December.
                        (b) Extensions to Power Supply.
                             (1)  In April the Royal Air Force Rest House
                                 and the British Overseas Airways Corpora­
                                 tion Jetty were connected by means of a
                                 new L.T. Line and transformer from the
                                 Shaikh*s Palace at Gudhaibiya.
                            (2)  The British Overseas Airways Corporation
                                Transit Camp, Gudhaibiya, was connected
                                by means of a new h.T. Line and 20 KVA
                                Transformer during July.
                            (3)  A new sub-station for the British Overseas
                                Airways Corporation Rest House was connected
                                direct from the Government power House by

                                                                  (continued)