Page 58 - PERSIAN 9 1941_1947
P. 58
- 4 -
to the main Manamah-Rafa1 road and ouoh of tha swamp
land south of Manamah was filltd In and now roads wars
oonstruotod ovor It*
The usual town cleaning and upkeep of roads, super*
vision of markets and munipsl services were maintained*
(11) Puharrao
Apart from the normal municipal services, which
were maintained throughout the year, the Muharraq Munici
pality concentrated their activities mainly on road-build
ing*
7* Public Works
The moat important public work to be completed
during the yeur was the ^anamali-lAiharraq bridge, which
was built by Messrs. Holloway Brothers* The war had
delayed considerably its completion, two sections of
the bridge being lost at sea. However, duplicates of
ths missing sections v/era made in the workshops of tht
Bahrain Petroleum Compsny and the bridge was opened by
His Highness the Shaikh of Bahrain on the 18th December,
1041*
The administrative block of ths Stats Hospital was
almost completed, the ground floor rooms being In occupa
tion before ths end of ths year*
Ths new Technical School was completed*
Hew married lines were built on the south side of
the Polios Fort In plaoe of the old hnts which formerly
accommodated families of the polios*
8* Blsotrlo Pepartfflerft
Owing chiefly to the lighting restrictions la
Bahrain, there was not the utuel Increase la load* The
5
connected load on the 31et December 1941 was 853 K*W«,
with a maximum recorded load of 168 K.V., the corresponds
ins figures for the previous year being 613 K*W* and
180 K#W# respectively*
Hew /•
mi. <