Page 25 - Verna Hill Flipbook
P. 25

•  New Kohler toilet
         •  New accessories                                      Upstairs Bathroom for
         •  Venetian plaster                                     Bedroom #2 & #3
         •  Lighting new ceiling lighting - color changing
             LED
                                                                 •  Brand new bathroom including double
                                                                     vanities, toilet and shower
         Paintwork                                               •  New fixtures and fittings


         •  Completely repainted throughout the entire           Gym
             home-Benjamin Moore

                                                                 •  Downstairs gym refit with glass sliding
         Lighting                                                    doors
                                                                 •  Floor to ceiling closets in studio
         •  New LED ceiling lights throughout entire
             home                                                Studio/ Guest Suite


         Master Dressing Room                                    Bathroom(main level)

                                                                 •  Brand new Kohler toilet
         •  Installation of large master dressing room
         •  New carpeting
                                                                 Mud Room Half Bath

         Master bathroom
                                                                 •  New toilet and basin installation

         •  Brand new master bath, shower, Kohler toilet
             and vanity, new lighting throughout                 Mud/Boot Room
         •  Radiant floor heating
         •  Brand new fixtures and fittings                      •  Reworked existing closets to turn them into
                                                                     shoe closet & added coat hanging space.
   20   21   22   23   24   25   26   27   28   29   30