Page 22 - 288 Birch Road brochure 2024
P. 22
HOME IMPROVEMENTS AND FEATURES
• Driveway sealed (May 2024) routinely maintained by Connecticut Air
• New Roof Maxx treatment (April 2024) Systems of Milford
(which revives shingles for another 5 years. • New hot water heater (2011), installed by
Chimney was also re-sealed. Top roof only) Connecticut Air Systems
• Upstairs bathroom: new vanity sink & • New breaker box inside and out in (2011)
fixtures, new subway tile in shower, new • New electrical downstairs in (2011)
faucets, and new floor tile (2022)
• New HVAC system (2011), installed and •