Page 67 - Regal ideas Binder_USA_v3
P. 67
Frameless Glass Railing
®
Installation Instructions
FRAMELESS GLASS RAILING SYSTEM
Installing Adjustable Clip (CRBA) 2 1.25” - 3.75”
*For use between 2 glass panels
1. Slide clips into position on glass.
Make sure the holes for the glue cavity are facing up. 1 3”-6” 3
2. Space between glass panes should be minimum
1.25” to 3.75” maximum. If space between glass
panels is larger than 4”, it will not be code compliant.
(See Diagram D, page 5)
3. Clips to be installed 3” to 6” from top of glass panel.
(See Diagram D, page 5)
4. Secure brackets in place using the CrystalRail Acrylic
Adhesive (See instructions page 12)
Installing Adjustable Clip (CRBW)
*For securing glass panel to wall
1. Slide clips into position on glass. Make sure the holes
for the glue cavity are facing up. 1
2. Space between glass panes should be minimum 1.25”
to 2.5” maximum. If space between glass panels is
larger than 4”, it will not be code compliant. 3”-6” 3
3. Clips to be installed 3” to 6” from top of glass panel. 4
(See drawing, page 5)
4. Use appropriate fasteners to mount bracket into wall or
post. 4
5. Secure brackets in place using the CrystalRail Acrylic
Adhesive (See instructions page 12)
Installing Base Plate Cover (CRBC)
1. Position the two piece base plate cover around base of
post and push to lock in place.
TIP: Apply dab of silicone on heads of post mounting bolts 1
before installing base plate covers to secure in place.
11
regalideas.com Section 2 | Installation (Deck or Flat Surface)
V1.2