              Sara Franco decided to pursue construction          to have an overview of
            after realizing she would enjoy a career where        the whole manufacturing
            each day could be vastly different, and she also      process of one of these
            thought it would be interesting to be involved        units. To overcome this,
            in multiple moving parts of the construction          I engaged senior team
            process. Just over a year ago, Sara attended a        members Andy Davis,
            Society of Women’s Engineering Conference and         Manufacturing Engineer
            was introduced to the company. Shortly after, in      and Mitch Breit, Quality         Sara Franco
            January 2022, Sara joined Anderson Dahlen as a        Assurance Supervisor, that      Engineer, Quality
     12     Quality Engineer immediately upon receiving her       were more knowledgeable
            master’s degree.                                      about the processes that occur and together
              In her time with Anderson Dahlen, Sara has faced    leveraged resources to meet the project
            a few challenges as is standard in any position.      deadlines.”
              “A project I was charged with was standardizing      Currently, one of Sara’s projects is an inspection
                                                                  process and criteria for fully assembled painted
            "Don’t be afraid to ask                               Reliant/Onto units.
                                                                   “I’m also putting together multiple training
            questions of your more senior                         guides for the quality inspection check and
            team members; they are more                           hardware acceptance testing that occurs once a

            positioned to teach you things                        ThermoFisher unit has been fully assembled,” said
                                                                  Sara. “In addition, I facilitate the non-conforming
            that you may not have thought                         parts that occur during the manufacturing process
            to ask or think about in a                            or parts that have been received in by a vendor.”
                                                                   As a Gray team member who is relatively new to
            different way."                                       the company, Sara’s advice to others is as follows:

                                                                  “Don’t be afraid to ask questions of your more
            the inspection process of finalized units,” said      senior team members; they are more positioned to
            Sara. “The challenge was – as a new team              teach you things that you may not have thought to
            member getting up to speed with the workings of       ask or think about in a different way.”
            the manufacturing plant – that it was necessary
   7   8   9   10   11   12   13   14   15