Page 6 - Graypvine March 2021
P. 6

Spec Engineering                     video and the module to follow along to receive

                             with Brian Bernard                   hands-on training in their office.
                             President
                                                                                  Willett Engineering

                                                                                  with J. Mac Willett
              The future is coming at us faster than we are                       President & Principal Engineer
            prepared for.
              That’s become apparent in the current climate. As
            we kick off 2021, Spec Engineering is planning for      In spite of last year's challenges, the Willett team
            the future. We know if we don’t take time to work     has been busy with a steady stream of structural
            on the business, we are going to lose sight of our    engineering projects from customers old and new.
            purpose. Spec Engineering’s purpose is Improving      We have embarked upon the new year with a robust
            Lives through Innovation, Responsibility and Trust,   slate of projects and a strong backlog.
      6     One Project at a Time. Currently, like many other       At Willett, we are immensely proud that one of
            companies in the Gray Family, we are on a journey     our projects – the Ford Auditorium Renovation at
            to develop our strategic plan and drive results, and   Berry College in Rome, Georgia – was awarded the
            are excited to continue that throughout 2021.         prestigious Architecture MasterPrize. Our part in the
              After only five years in our current building,      project was to analyze the historic building’s roof
            we have outgrown its walls. With a significant        framing and to engineer a new acoustic roof. The
            investment in team growth and increased               project presented unique challenges, and I want to
            service offerings over the last year, this outcome    commend design engineer Moumita Ganguly, EIT, on
            was inevitable. Our new 75,000 s.f. corporate         her many hours of diligent work.
            headquarters is located in Naperville, Illinois, a      We recently welcomed back our friend and
            suburb 35 miles outside of Chicago. With 20,000       colleague Brandon Hoffman, PE, who was an
            s.f. of the buildout designed for office space, our   integral part of our team from 2009 to 2018. Having
            60+ employees will have an expansive, collaborative   him back on board expands our capacity to meet
            workspace. When complete in mid-2021, the             the growing needs of our customers in the year
            facility will include eight fabrication, assembly     to come.
            and manufacturing cells for our skid systems            To our Gray family, we love working with you,
            and equipment lines, a large UL panel shop,           and we are available to meet any of your structural
            lab/showroom for product testing, equipment           engineering needs. It’s a pleasure to work with
            demonstrations and factory acceptance testing, and    people who share our values, goals and vision.
            VR studio, to name a few.
              Most importantly, our commitment to Safety is                        Ohio Valley
            continuing to take on more structure and soon will                     with Steve Renshaw
            be able to reach beyond our own team and touch                         President
            other companies in the Gray family. Spec has built
            our first Lockout/Tagout Trainer Module that we will
            be bringing on the road to visit each company in        We started off 2021 with a bit of good news with
            order to enrich safety training programs. It has been   two projects back on the go list. A Goodwill Store in
            designed and built to be compact and transportable.   Pikeville, Kentucky (our 3rd store in two years) and
            When it arrives, each team will be able to use our    Jack Kain Ford - Service Center Expansion will both
   1   2   3   4   5   6   7   8   9   10   11