Contact with Hot Meal











           1    What is the name of the       2    What are its specific objectives related to the Priority Unwanted
                                                   Event (PUE)?
                critical control for Contact
                with Hot Meal?
          Hot Meal Containment               Ensure hot meal containment system integrity throughout the entire kiln production
                                             campaign.


           3    What are the critical         4    What are the activities       5    What can be sampled from
                                                   within the management
                control performance
                                                                                      the set of activities for
                requirements to meet the           systems that support               verification, providing a
                objectives?                        having the critical control        clear image of the critical
                                                   able to do what is required?       control status?
          Refractory and steel envelope of raiser   Inspection and maintenance   CMMS records from prior maintenance
          duct, preheater vessels & ducts, and   in Computerized Maintenance    shutdowns including corrective
          TAD are brought back to good condition   Management System (CMMS) per   maintenance performed
          during the kiln major maintenance   Corporate CEM guidance
          shutdowns to ensure it will hold during                               Number of hot spots detected during
          the next production campaign       Classified as highest priority and critical   production campaign
                                             equipment in CMMS

          Kiln back-end seal, plates, feedshelf   Inspection and maintenance in CMMS   CMMS records from prior maintenance
          and refractory are brought back to   per Corporate CEM guidance       shutdowns including corrective
          good condition during the kiln major   Classified as highest priority and critical   maintenance performed
          maintenance shutdowns to ensure it   equipment in CMMS                Amount of hot meal spillage during
          will hold during the next production                                  production campaign
          campaign

          Daily routine inspection to detect   Daily Inspection routine (included in walk-  CMMS backlog of work orders for next
          preheater and kiln back-end  condition   by inspection)               major shutdown
          (absence of refractory, cracked, burned                               Refractory work backlog for next major
          or overheated steel)                                                  shutdown

          Kiln back end seal and tertiary air duct   Daily Inspection to verify condition of the   Daily Inspection records and cleaning
          elbow are equipped with secondary   containment barrier and filling level  frequency
          containment of hot material

           6    What is the target performance for critical     7    What is the critical control performance
                                                                     trigger for shutdown, critical control review or
                control?
                                                                     investigation?
          All the inspections and maintenance are carried out 100% with-  Unauthorised deferment of refractory/envelope repairs without
          out any deferments. There is no leakeage of hot meal during the   Plant Manager’s written authorisation
          production campaign due to loss of refractory or burned steel
          envelope