Page 146 - Enfield SuDS DESIGN & EVALUATION
P. 146

Detailed Design  9.12.3 Example of SuDS and Site Maintenance                  Normal site    Suggested





                                                                                    care (Site) or
            Type
                          Activity
                                                                                    SuDS-specific
                                                                                                   frequency
                                                                                    maintenance
                                                                                    (SuDS)
            Regular Maintenance

            LItter
                          Pick up all litter in SUDS Landscape areas along
                          with remainder of the site – remove from site             Site           1 visit monthly
            Grass         Mow all grass verges, paths and amenity grass at          Site           As required or
                          35-50mm with 75mm max.  Leaving cuttings in situ                         1 visit monthly

            Grass         Mow all dry swales, dry SUDS basins and margins           Site           4-8 visits per
                          to low flow channels and other SUDS features at                          year or as
                          100mm with 150mm max. Cut wet swales or basins                           required
                          annually as wildflower areas – 1st and last cuts to be
                          collected
            Grass         Wildflower areas strimmed to 100mm in Sept or at          Site           1 visit annually
                          end of school holidays – all cuttings removed
                          Or
                          Wildflower areas strimmed to 100mm on 3 year
  141                     rotation – 30% each year – all cuttings removed                          1 visit annually
            inlets &      Inspect monthly, remove silt from slab aprons and         SuDS           1 visit monthly
            outlets       debris.  Strim 1m round for access

            Permeable  Sweep all paving regularly to keep surface tidy              Site           1 visit annually
            paving                                                                                 or as required


            Occasional Tasks

            Permeable  Sweep and suction brush permeable paving when                SuDS           As required -
            paving        ponding occurs                                                           estimate 10-15
                                                                                                   year intervals
            Flow          Annual inspection of control chambers - remove silt  SuDS                1 visit annually
            controls      and check free flow

            Wetland &     Wetland vegetation to be cut at 100mm on 3 – 5            Site           As required
            pond          year rotation or 30% each year.  All cuttings to be
                          removed to wildlife piles or from site.









           Enfield Council SuDS D & E Guide                                                                            © 2018 McCloy Consulting & Robert Bray Associates
   141   142   143   144   145   146   147   148   149   150