Detailed Design  9.12.3 Example of SuDS and Site Maintenance                  Normal site    Suggested                  Silt           Inspect swales, ponds, wetlands annually for silt        Site & SuDS    1 visit annually     Detailed Design

                                                                                                                                             accumulation


                                                                                                                              Silt
                                                                                                                                             Excavate silt, stack and dry within 10m of the SUDS  Site & SuDS
                                                                                                                                                                                                                     As required
                                                                                    care (Site) or
                                                                                                                                             feature, but outside the design profile where water
                          Activity
            Type
                                                                                    SuDS-specific
                                                                                                   frequency
                                                                                                                                             flows. Spread, rake and overseed.
                                                                                    maintenance
                                                                                                                              Native
                                                                                                                                                                                                                     1 visit annually
                                                                                                                                             Remove lower branches where necessary to ensure  SuDS
                                                                                    (SuDS)
            Regular Maintenance
                                                                                                                                             erosion.
                          Pick up all litter in SUDS Landscape areas along
            LItter
                                                                                                                              Remedial Work
                          with remainder of the site – remove from site             Site           1 visit monthly            planting       good ground cover to protect soil profile from
            Grass         Mow all grass verges, paths and amenity grass at          Site           As required or             General        Inspect SuDS system to check for damage or failure  SuDS                Monthly
                          35-50mm with 75mm max.  Leaving cuttings in situ                         1 visit monthly            SuDS           when carrying out other tasks.
            Grass         Mow all dry swales, dry SUDS basins and margins           Site           4-8 visits per                            Undertake remedial work as required.                                    As required
                          to low flow channels and other SUDS features at                          year or as
                          100mm with 150mm max. Cut wet swales or basins                           required                  9.12.4 Silt and waste management
                          annually as wildflower areas – 1st and last cuts to be
                          collected                                                                                          Silt and sediment removal is often considered          Silt management and removal from site
            Grass         Wildflower areas strimmed to 100mm in Sept or at          Site           1 visit annually          a major element of SuDS management. In                 should follow the protocols set out in the
                          end of school holidays – all cuttings removed                                                      most cases where SuDS features are located             SuDS Manual Chapter 32 p699
                          Or                                                                                                 at the surface silt accumulates slowly and can
                                                                                                                                                                                    SuDS vegetation green waste can be
                          Wildflower areas strimmed to 100mm on 3 year                                                       be removed easily. Management of silt                  managed in the same way as site green
  141                     rotation – 30% each year – all cuttings removed                          1 visit annually          becomes more difficult and costly at the end           waste, either on site in wildlife piles, compost      142
            inlets &      Inspect monthly, remove silt from slab aprons and         SuDS           1 visit monthly           of the management train, particularly in               arrangements or taken off site.
            outlets       debris.  Strim 1m round for access                                                                 ponds and wetlands.
                                                                                                                                                                                    The use of composted green waste or
            Permeable  Sweep all paving regularly to keep surface tidy              Site           1 visit annually          Where silt has accumulated in SuDS
            paving                                                                                 or as required            components downstream or the design has                chipped woody material should be
                                                                                                                                                                                    considered for raingardens, bioretention or
                                                                                                                             specifically included a silt collection feature,
            Occasional Tasks                                                                                                                                                        any other planted feature on site.
                                                                                                                             for instance in SuDS retrofit schemes, it is
            Permeable  Sweep and suction brush permeable paving when                SuDS           As required -             important to monitor silt accumulation                 Any waste considered to be contaminated
            paving        ponding occurs                                                           estimate 10-15            visually and by simple monitoring.                     should be evaluated as set out in the SUDS
                                                                                                   year intervals                                                                   Manual Chapter 33 – Waste management
            Flow          Annual inspection of control chambers - remove silt  SuDS                1 visit annually          Silt removed from most low to medium risk              p709
            controls      and check free flow                                                                                sites can be de-watered and land applied
                                                                                                                             within the site but outside the SuDS                    EA Regulator Position Statement 055
            Wetland &     Wetland vegetation to be cut at 100mm on 3 – 5            Site           As required               component profile. The EA will not pursue an
            pond          year rotation or 30% each year.  All cuttings to be                                                application for an environmental permit                 www.gov.uk/government/uploads/
                          removed to wildlife piles or from site.                                                                                                                    system/uploads/attachment_data/
                                                                                                                             where the requirements of Regulatory
                                                                                                                                                                                     file/525315/LIT_9936.pdf
                                                                                                                             Position Statement 055 are met.





           London Borough of Newham SuDS D & E Guide                                                     © 2018 McCloy Consulting & Robert Bray Associates  London Borough of Newham SuDS D & E Guide                                                     © 2018 McCloy Consulting & Robert Bray Associates
   141   142   143   144   145   146   147   148   149   150