Detailed Design  9.12.3 Example of SuDS and Site Maintenance   Normal site   Suggested   Silt   Inspect swales, ponds, wetlands annually for silt   Site & SuDS  1 visit annually  Detailed Design

                     accumulation


       Silt
                     Excavate silt, stack and dry within 10m of the SUDS  Site & SuDS
                                                                                              As required
 care (Site) or
                     feature, but outside the design profile where water
 Activity
 Type
 SuDS-specific
 frequency
                     flows. Spread, rake and overseed.
 maintenance
       Native
                                                                                              1 visit annually
                     Remove lower branches where necessary to ensure  SuDS
 (SuDS)
 Regular Maintenance
                     erosion.
 Pick up all litter in SUDS Landscape areas along
 LItter
       Remedial Work
 with remainder of the site – remove from site  Site  1 visit monthly   planting  good ground cover to protect soil profile from
 Grass  Mow all grass verges, paths and amenity grass at   Site  As required or   General   Inspect SuDS system to check for damage or failure  SuDS  Monthly
 35-50mm with 75mm max.  Leaving cuttings in situ  1 visit monthly  SuDS  when carrying out other tasks.
 Grass  Mow all dry swales, dry SUDS basins and margins   Site  4-8 visits per   Undertake remedial work as required.   As required
 to low flow channels and other SUDS features at   year or as
 100mm with 150mm max. Cut wet swales or basins   required  9.12.4 Silt and waste management
 annually as wildflower areas – 1st and last cuts to be
 collected  Silt and sediment removal is often considered    Silt management and removal from site
 Grass  Wildflower areas strimmed to 100mm in Sept or at   Site  1 visit annually  a major element of SuDS management. In   should follow the protocols set out in the
 end of school holidays – all cuttings removed  most cases where SuDS features are located   SuDS Manual Chapter 32 p699
 Or   at the surface silt accumulates slowly and can
                                                             SuDS vegetation green waste can be
 Wildflower areas strimmed to 100mm on 3 year   be removed easily. Management of silt   managed in the same way as site green
 141   rotation – 30% each year – all cuttings removed  1 visit annually  becomes more difficult and costly at the end   waste, either on site in wildlife piles, compost   142
 inlets &   Inspect monthly, remove silt from slab aprons and   SuDS  1 visit monthly  of the management train, particularly in   arrangements or taken off site.
 outlets  debris.  Strim 1m round for access  ponds and wetlands.
                                                             The use of composted green waste or
 Permeable  Sweep all paving regularly to keep surface tidy  Site  1 visit annually   Where silt has accumulated in SuDS
 paving  or as required  components downstream or the design has   chipped woody material should be
                                                             considered for raingardens, bioretention or
      specifically included a silt collection feature,
 Occasional Tasks                                            any other planted feature on site.
      for instance in SuDS retrofit schemes, it is
 Permeable  Sweep and suction brush permeable paving when   SuDS  As required -   important to monitor silt accumulation   Any waste considered to be contaminated
 paving  ponding occurs  estimate 10-15   visually and by simple monitoring.  should be evaluated as set out in the SUDS
 year intervals                                              Manual Chapter 33 – Waste management
 Flow   Annual inspection of control chambers - remove silt  SuDS  1 visit annually  Silt removed from most low to medium risk   p709
 controls  and check free flow  sites can be de-watered and land applied
      within the site but outside the SuDS                    EA Regulator Position Statement 055
 Wetland &   Wetland vegetation to be cut at 100mm on 3 – 5   Site  As required  component profile. The EA will not pursue an
 pond  year rotation or 30% each year.  All cuttings to be   application for an environmental permit   www.gov.uk/government/uploads/
 removed to wildlife piles or from site.                      system/uploads/attachment_data/
      where the requirements of Regulatory
                                                              file/525315/LIT_9936.pdf
      Position Statement 055 are met.