Page 34 - Newham SuDS DESIGN & EVALUATION GUIDE
P. 34
Holyoakes School
Modified Flow Routes
key
Step 2 – Modified Flow Route analysis
Concept Design Step 1 – Existing Flow Route analysis Holyoakes School The modified flow route analysis is the basis Once the modified flow routes have Concept Design
Proposed hard surfaces
Existing Flow Routes
Proposed soft surfaces
Proposed trees
demonstrated that runoff can flow
for low flow conveyance through the site,
key
predictably through the site, the arrangement
overflow arrangements and exceedance
Existing Contour
Existing contours
Proposed contours
routes when design criteria are exceeded.
of runoff collection, source control, site
Existing Flow Route
Existing surface ow
control, regional control, conveyance, storage
Surface ow
and final release from site can be designed.
Roof runo
Holyoakes School
Modified Flow Route
Modi ed ow routes Holyoakes School
Existing Flow Routes
Modified Flow Routes
key
Existing contours key
Proposed hard surfaces
Existing surface ow
Proposed soft surfaces
Proposed trees
Proposed contours
Surface ow
29 30
Roof runo
Modi ed ow routes
Existing landscape
features
Habitat
considerations Proposed
Historical drainage discharge to
existing ditch
Flow Route Analysis for Holyoakes School, Robert Bray Associates. Modified Flow Route Analysis for Holyoakes School, Robert Bray Associates.
London Borough of Newham SuDS D & E Guide © 2018 McCloy Consulting & Robert Bray Associates London Borough of Newham SuDS D & E Guide © 2018 McCloy Consulting & Robert Bray Associates