Page 78 - The Lost Ways
P. 78

The pipe installed to connect the fire box to
                   the  smokehouse  should  have  an  upward
                   pitch. It will curve to reach the smokehouse
                   right  in  the  middle  of  the  cement  floor

                   [Figure 4].




























                                                  Figure 4.


                   Building The SmokeHouse



                   Now  that  the  firebox  and  has  been
                   completed and the delivery pipe has been
                   properly  installed  and  fitted,  it’s  time  to
                   move on to building the smokehouse.

                   Pour a concrete foundation, and let it dry

                   [Figure 5]. If the depth of the foundation is
                   23’’,  the  foundation  should be  about  17’’.
                   Move  on  to  building  the  walls  of  the
                                                                          Figure 4.





                                                             77
   73   74   75   76   77   78   79   80   81   82   83