Page 78 - The Lost Ways
P. 78
The pipe installed to connect the fire box to
the smokehouse should have an upward
pitch. It will curve to reach the smokehouse
right in the middle of the cement floor
[Figure 4].
Figure 4.
Building The SmokeHouse
Now that the firebox and has been
completed and the delivery pipe has been
properly installed and fitted, it’s time to
move on to building the smokehouse.
Pour a concrete foundation, and let it dry
[Figure 5]. If the depth of the foundation is
23’’, the foundation should be about 17’’.
Move on to building the walls of the
Figure 4.
77