Page 14 - EMPHISS
P. 14

NOTES
                                                                                                                                                                                                         SCHEME EXTENT                                                                                                                                                                                                               1.  Contractor to be aware of risks outlined in the Residual Risk


                                                                                                                                                                                                                                                                                                                                                                                                                                         Register.
                                                                                                                                                                                                                                                                                                                                                                                                                                     2.
                                                                                                                                                                                                                                                                                                                                                                                                                                         Do not scale from this drawing. If in doubt refer to the Project
                                                                                                                                                                                                                                                                                                                                                                                                                                         Manager for clarification.
                                                                                                                                                                                                                                                                                                                                                                                                                                         This drawing is based upon Topographical Survey information
                                                                                                                                                                                                                                                                                                                                                                                                                                     3.
                                                                                                                                                                                                                                                                                                                                                                                                                                         supplied by Plowman Craven (25 March 2021) Drawing Ref
                                                                                                                                                                                                                                                                                                                                                                                                                                         46368T-01A.
                                                                                                                         VICTORIA STREET                                                                                                                                                                                                                                                                                              4.  This drawing should be read in conjunction with all other relevant
                                                                                                                                                                                                                                                                                                                                                                                                                                         Victoria Street Contraflow Section 278 drawings and
                                                                                                                                                                                                                                                                                                                                                                                                                                         specifications.
                                                                                                                                                                                                                                                                                                                                                                                                                                     5.  If there is any ambiguity between the specification and the
                                                                                                                                                                                                                                                                                                                                                                                                                                         drawings. Refer to the Project Manager for clarification.
                                                                                                                                                                                                                                                                                                                                                                                                                                     6.  Pavement levels to be in accordance with drawings
                                      A                                                                                                                                                                                                                                                                                                                                                                                                  NE3-MTC-XXX-100-DR-CR-00003.
                                                                                                                                                                                                                                                                                                                                                                                                                                     7.  For Pavement Option details see drawing
                        A                                                                                                                                                                                                                                                                                                                                                                                                                NE3-MTC-XXX-100-DR-CR-01103.
                                                                                                                                                                                                                                                                                            BRESSENDEN PLACE
          P-E                                                                                                                                                                                                                                                                                                                                                                                                                        8.  For Pavement Interface details see drawing
                                                                                                                                                                                                                                                                                                                                                                                                                                         NE3-MTC-XXX-100-DR-CR-01111.
                                                                                                                                                                                                                                                                                                                                                                                                                                     9.  Any indication of site boundaries is to be considered
                                                                                                                                                                                                                                                                                                                                                                                                                                         diagrammatic. This drawing is based on layouts prepared by
                                                                                                                                                                                                                                                                                                                                                                                                                                         others and our details are not in themselves intended to be any
                                                                                                                                                                                                                                                                                                                                                                                                                                         definition of land ownership.
                                                                                                                                                                                                                                                                                                                                                                                                                                     10. All ironwork should be adjusted to be flush with final road level.

                                                                                                                                                                                                                                                                                                                                                                                                                                      KEY
                                                                                                                                                                                                                                                                                                                                                                                                                                             Proposed Kerb Line, in accordance with drawings
                                                                                                                                                                                                                                                                                                                                                                                                                                             NE3-MTC-XXX-100-DR-CR-11001

                                                                                                                                                                                                                                                                                                                                                                                                                                             Pavement option A in accordance with drawing
                                                                                                                                                                                                                                                                                                                                                                                                                                       P-A
                                                                                                                                                                                                                                                                                                                                                                                                                                             NE3-MTC-XXX-100-DR-CR-01103
                                                                                                                                                                                                                                                                                                                             SCHEME EXTENT                                                                                             P-E   Pavement option E in accordance with drawing
                                                                                                                                                                                                                                                                                                                                                                                                                                             NE3-MTC-XXX-100-DR-CR-01103

                                                                                                                                                                                                                                                                                                                                                                                                                                              See sections on drawing
                                                                                                                                                                                                                                                                                                                                                                                                                                              NE3-MTC-XXX-100-DR-CR-01111
            INSET B
            INSET B
            INSET B




                                                                                 ALLINGTON STREET                                                                                                                                                                                                           P-E                                                      P-A








             SCHEME EXTENT                                                                                SCHEME EXTENT








                                                                                                                                                                                                                                                                                                                                                                                             A            A
                                                                                                               Refer to Drg. No. M000402-2-1-DR-037                                                                                                                                                                                                                           P-E
                                                       WCC
                                                                                                               for temporary S278 surface works
                                                       TfL                                                                                                                                                                                                                                                                                          B
                                                                                                                                                                                                                                                                                                                                       B
                                                                                                                                                                                                                                                                                                                             P-A
                                                                                                                                                                                                                                                      P-A





                                                                                                                                                                                                                                                          B

                                                                                                                                                                                                                                                           B


                                                                                                                                                                                                                                                                                                  VICTORIA STREET
                                                                                               P-E



                                                                                                                                                                                                                                                                            P-E
                                                                                                                                                                      VICTORIA STREET
                                                                                                                                                                                                                                                  A                                                                                                                       TfL  WCC

                                                                                        A                                                                                                                                           A
                                                                          A





                                                                                                                 P-A







                                                                                                                                                                                                                                                                                       TfL
                                                                                                                                                                                                                                                                                        WCC
                                                                                                                                                                                                                                                                                   B
                                                                                                                                                                                                                                                                     B                    P-E                                                                                                                                          0   20/05/22  DSC  For Construction  MPC DHG


                                                                                                                                                                                                                                                                                                                                                                                                                                       Rev  Date    By  Remarks            Chkd  Appd
                                                                                                                                                                                                                                                                                                                  SCHEME EXTENT


                                                                                                                                                                                                                                                 P-A


                                                                                                                                                                                                                                                                                       CARLISLE PLACE
                                                                                                                                                                                                                                                                                                                                                                                                                                       Client









                                                              WILTON ROAD                                                                                  VAUXHALL BRIDGE ROAD                                                                                                                                                                                                                                                        Job Title            N2



                                                                                                                                                                                                                                                                                                                                                                                                                                       Drawing Title

                                                                                                                                                                                                                                                                                                                                                                                                                                         SECTION 278 HIGHWAY WORKS
                                                                                                                                                                                                      SCHEME EXTENT                                                                                                                                                                                                                     VICTORIA STREET CONTRAFLOW

                                                                                                                                                                                                                                                                                                                                                                                                                                           PAVEMENT CONSTRUCTION

                                                                                                                                                                                                                                                                                                                                                                                                                                       Scale at A1
                                                                                                                                                                                                                                                                                                                                                                                                                                                           1:200

                                                                                                                                                                                                                                                                                                                                                                                                                                       Discipline
                                                                                                                                                                                                                                                                                                                                                                                                                                             HIGHWAY ENGINEERING

                                                                                                                                                                                                                                                                                                                                                                                                                                       Drawing Status
                                                                                                                                                                                                                                                                                                                                                                                                                                               FOR CONSTRUCTION
                                                                                                                                                                                                                                                                                                                                                                                                                                       Drawing No                                Issue
                                                                                                                                                                                                                                                                                                                                                                                                              INSET A                 NE3-MTC-XXX-100-DR-CR-07001                  0
           SCHEME EXTENT
   9   10   11   12   13   14   15   16   17   18   19