ISO FULL BLEED A3 420 X 297 MM 1. Do not scale from this drawing, work to figured N
NOTES
dimensions only.
N
2.
Drawing is based Topographical survey
produced by Greenhatch Group on
26/04/2021- Drawing Ref 26846B_T_ Rev 0. The way the world moves. By design.
3. Affected footway around site to be
strengthened/ protected and carriageway
levels potentially raised to accommodate
pitlane arrangements.
4. Footway strengthening works fronting the
Home Office - Bermondsey to be coordinated
Mounted on the See Note 7 with access requirements.
face of the hoarding
5. See drawing M000870-2-1-TR-004 & 005 for
swept path analysis. OVERVIEW PLAN
BT
6. Drawing should be read in conjunction with
Duct
ELC Duct Traffic Signal Removal drawing reference No.
CPS N
BT Bo Duct M000870-2-1-DR-001-003.
IC
4.51
S1 CPS BT Bo BT CPS
M000870-2-1-DR-007 IC 4.44 St Wm Gy 4.44 Signal infrastructure for redundant crossing to
Bo 4.456 IC
Bo Bo
Lp St Fh Bo CPS Bo Wm Bo Bo Fh St Bo TL Bo Bo Bo TT TS Bo Bo Bo Lp Bo TL Bo Bo Bo Bo Bo Bo IC 4.41 Bike rack 4.39 Lp 7. Existing pedestrian controlled crossing east of
Bo
Weston Street junction to become redundant.
BT BT IC 4.47 Gy 4.47 Wm ST THOMAS STREET Sv 3.25 TS ST THOMAS STREET be decommissioned and associated tactile
BT ICU TL Gy 4.46 M IC 4.46 TL St IC 4.27 paving rotated face down during construction
TT TT Fh TT IC BT 3.50 Tarmac IC 4.42 Gas CATV Wm GH4 4.438 TS CBX CBX TS TS TS TS TS TS phase.
Tarmac
4.48 IC BT Tarmac 4.46 St CBX TS
Sp
Boll
TS ELC @CLUEDUP COFFEE Boll Boll Boll Boll Boll Heras ht 2.0m Boll Boll Boll 8. Due to spatial constraints, pitlanes to be
Gy Sp
BT 4.46 TS CVR BP Location to be confirmed managed by marshalls to ensure vehicular
Wall ht 0.66m CPS TS Gy 4.50 IC BP CPS Cbox
IC 4.52 Bush CPS activities is controlled where concertina
4.50 CPS F: Pedestrian access requirements
Wall ht 1m 27.66 barriers need to remain open to accommodate
Lp Wall ht 1m to be confirmed TS
Bush Wall ht 0.3m vehicle off-loading.
Sp IC 4.53 Gy
LC 4.18
ICU TS BH CPS Bush Wall ht 0.4m Wall ht 2m Steps
Wall ht 0.66m BP Boll Bush KEY
CPS
Boll THL THL
Heras ht 2.0m Wall ht 1.3m 4.75 2.81 LOCATION PLAN
Boll Works area
Ret.Wall
BP M Boll
TS Sp Gy 2.69 Bike Racks DP
CPS Boll I/R ht 2.6m Mass Barrier
Concrete So 7.47 W/M ht 1.3m FENNING STREET
Steps
Er
Ret.Wall Steps Pedestrian Barrier
IC
Er 4.67 Gy
CPS 4.26 Planters
BP Wall ht 1.3m Concrete
3.60 THL 4.59 Steps Concertina Barrier
ELC 5x parking bay suspended
4.49 3.25 Gy to accommodate pitlane.
Pipe
Gy 4.55 Concrete
CVR
4.98 THL Hoarding
ELC
E2 4.143
Wall ht 0.3m I/R ht 2.6m Pipe
Lp CVR Pipe GH6
4.771
BT Hedge ht 1.8m I/R ht 1.6m
4.70 IC Pit lane
IC
4.69
Access no longer in use.
BP Wall ht 5.6m
IC Gas To be confirmed.
4.60 THL
Pipe 4.90
St Pipe Re
CPS CVR Pipe Footway Strengthening
WESTON STREET
Concrete
BP
So
BP Concrete 7.48 Site Gate
Gy
I/R ht 2.6m 4.48
Lp Wall ht 1.3m
CPS M Traffic Marshal
THL C 05/10/21 Amendments following RSA PS TE IRT
IC 4.69 4.67 Hedge ht 1.8m
Wall ht 0.66m I/R ht 1.6m B 04/08/21 Second Issue IH TE IRT
BP BH Wall ht 5.6m Traffic Cone
BT TS GH5 4.734 A 23/07/21 First issue IH TE IRT
TS M M12S 4.895 I/R ht 2.6m DRN CHKD APRVD
Wall ht 1.3m I/R ht 2.6m IC REV DATE REVISION DESCRIPTION / DETAILS
GH2 BT Tarmac Lp St 4.64 TS TS Temporary traffic sign BY BY BY
4.821 BP TS TS M St Wm Concrete Wall ht 1.3m St Concrete TS Lp Gas TS
M000870-2-1-DR-007 IC 4.66 CVR St St St Wm IC 4.68 TS Boll St BT Boll BT Tarmac IC CTV 4.61 Gas St Wm Tarmac M MELIOR STREET R: TS MELIOR STREET TS M11S 4.233 3x3m TBS
Gas
TS
TS
GH1
Wheel stop
4.624
IC
(TVCB) to a suitable height.
4.60
R: E: 14.42 16.17 20.50 TS Temporary Vertical Concrete Barriers CLIENT:
Pedestrian crossing provision
F:
TS JOB TITLE:
54.91 WESTON STREET
ST THOMAS STREET
DEVELOPMENT CLUSTER
DRAWING TITLE:
TS CHAPTER LIVING DEVELOPMENT
GA AND TEMPORARY TRAFFIC MANAGEMENT
OPTION 2 - SHEET 1 OF 2
STATUS:
FOR INFORMATION
DRAWING NO: REV: SCALE AT A3:
M000870-2-1-DR-006 C NTS