Page 2 - EMPHISS
P. 2
ISO FULL BLEED A3 420 X 297 MM N N The way the world moves. By design.
ZONE 1
G
OVERVIEW PLAN
NOTES
ZONE 4
1. Do not scale from this drawing.
2. This layout has been based upon discussions
with client AHMM Architects.
3. This layout has not been subject to a Road
G
Safety Audit and is for discussion purposes only.
4. See drawing M000532-2-1-TR-002 for
Swept path analysis.
KEY
Proposed setts
Proposed tactile paving
Proposed ramp
Proposed kerb line
Existing one way traffic street
LOOK RIGHT Existing two way traffic street
G LOOK LEFT
LOOK LEFT LOOK LEFT G
LOOK RIGHT
LOOK LEFT LOOK RIGHT G LOOK RIGHT
G LOOK LEFT
LOOK RIGHT
G
G
G
G
RS
G
G
C 28/11/23 Layout revised following client comments IH KN JT
B 24/11/23 Kerb alignment revised IH KN JT
A 24/10/23 First issue IH KN JT
DRN CHKD APRVD
REV DATE REVISION DESCRIPTION / DETAILS
BY BY BY
G
G
CLIENT:
G
CORE
G
JOB TITLE:
LANSDOWNE HOUSE
DRAWING TITLE:
PROPOSED RAISED TABLES
STATUS:
FOR REVIEW & COMMENT
LP
DRAWING NO: REV: SCALE AT A3:
M000532-2-1-SK034 C 1:500