Page 7 - EMPHISS
P. 7
L
K
F
J
E
G
H
M
C
1
00.0
20.0
2
2
N
3
3
4
4
LP
IC
5
5
A
B
EP
SP
A
6
6
Grass
7
7
PO
60.0 50 to 100mm ground penetration TP Concrete D PO 0 to 50mm ground penetration Building 0 to 50mm ground clearance A 50 to 100mm ground clearance B -0.01m Existing ground level -0.13m vehicle traveling at 5mph B Swept path analysis is based on the following 0.13m ground penetration dimensions only. Section B - B SV Dimension are in meters. Work to figured Do not scale from this drawing A Existing ground level NOTES QR CODE 1
PO
PO
PO
LP
PO
PO
Track
8
8
Tree
SP
SP
Manhole
pl
Tarmac
Tree Canopy
9
9
B
Tree
Building
Section A - A
10
10
80.0
Chamber
11
11
0
0
Car Park
12
12
SCALE 1:200
100.0
0.01m ground penetration
13
13
10m
IH
01
Rev
Title
Drawn
Project
Customer
Date
11.05.23
14
14
Drawing Status
ROYAL OAK
Revision Information
Details
C14993-SPA-011
Project Drawing Reference
3+4 LOW LOADER
dimensions thus obtained. IF IN DOUBT ASK.
FIRST ISSUE
VolkerStevin Drawing Reference
SE10-BOL0129-SPA-011
11.05.23
SWEPT PATH ANALYSIS
15
15
Issue Date
Over 100 penetration
KEY (ground conflict report)
GROUND CONFLCIT ANALYSIS
A3
PRELIMINARY - FOR INFORMATION
Sheet Size
IH
Dra
parties without the consent of the author. Previous versions of this drawing should be marked
16
16
1:200
Scale
Chk
Over 100 ground clearance (no colour)
CW
This drawing is issued by VolkerStevin subject to the condition that it is not copied or disclosed to third
SUPERSEDED or destroyed. Scaling this drawing is not recommended and no guarantee can be given to
SE
Apv
J
G
K
H
F
B
C
D
A
E
L
M