Page 4 - EMPHISS
P. 4

ISO FULL BLEED A3 420 X 297 MM  N                                                                                                             NOTES                                                  N
                                                                                                                                                 1.
                                                                                                                                                    The Contractor is to be aware of risks outlined in the Residual Risk
                                                                                                                                                    Register prior to commencing work.
                                                                                                                                                 2.
                                                                                                                                                    Do not scale from this drawing. If in doubt refer to the Project
                                                                                                                                                    Manager for clarification.
                                                                                                                                         TURNAGAIN LANE  3.  This drawing is based upon Topographical Survey information                     The way the world moves. By design.
                                                                                                                                                    supplied by Plowman Craven ( November 2020) Drawing Ref
                                                                                                                                                    45677T-01C-prov2 3D.
                                                                                                                                                 4.
                                                                                                                                                    This drawing should be read in conjunction with all other relevant
                                                                                                                                                    Holborn Viaduct drawings and specifications.
                                                                                                                                                    If there is any ambiguity between the specification and the
                                                                                                                                                 5.
                                                                                                                                                    drawings, refer to the Project Manager for clarification.
                                                                                                                                                 6.  All dimensions, levels and survey grid co-ordinates are to be
                                                                                                                                                    checked on site and the Engineer notified immediately of any
                                                                                                                                                    discrepancies prior to the commencement of the works.
                                                                                                                                                 7.  Any indication of site boundaries is to be considered diagrammatic.
                                                                                                                                                    This drawing is based on layouts prepared by others and our details
                                                4.75                                                                                                are not in themselves intended to be any definition of land
                                                                                                                                                    ownership.
                                                                                                                                                 8.  All items in grey are to be retained unless stated otherwise.  OVERVIEW PLAN
                                                                                                                                                    Temporary traffic management to be designed and provided by
                                                                                                                                                 9.
                                                                                               2.35                 G            G  FOR CONTINUATION REFER TO VIEWPORT B  10. Marshals and barriers recommended to facilitate movement  N
                                                                                                                                                    others.
         SCHEME EXTENTS                                                                              3.75             1.65                       KEY  throughout and adjacent to the site. Indicative locations shown on
                                                                                                                                                    this plan. Final locations to be the responsibility of the contractor.


                                                                                                                                                        Existing highway boundary

                                                                                                                                                        S278 boundary                                           VIEWPORT A
                                                                                                     3.30
                                                                       20.65                                                                            Indicative MASS Barrier with HERAS fencing to be         VIEWPORT B
                                                                                                                                                        designed and implemented by others
                                                                                                     3.30
                                                                                                                                                        Indicative MASS Pedestrian guard to be designed and
                                                                                                                                                        implemented by others
                                                                                                         8.90
                                                                                                                                                        Indicative proposed concertina barrier to be designed and  LOCATION PLAN
                                                                                                                                                        implemented by others                                 Proposed cycle road markings. Refer to
       VIEWPORT A
                                                                                                                                                                                                              drawing M000705-3-1-PL-120001 for
                                                                                                                                                        Indicative proposed hoarding to be designed and       further details
                                                                                                                                                        implemented by others
                                                                                                                                                                                                              Proposed traffic signs. Refer to drawing
             N                                                                       NEWCASTLE CLOSE                                                    Indicative Pedestrian/Cycle Gantry to be designed and  RS  M000705-3-1-PL-120001 for further details
                                                                                                                                                        implemented by others
                                                                                                                                                                                                              CCTV camera to be attached to the
                                                                                                                                                                                                              hoarding, pending outcome of coordination
                               TURNAGAIN LANE                                                                                                           Proposed asphalt paving P1 to new levels for cycle lane  CCTV  Existing CCTV pole to be retained in
                                                                                                                                                                                                              with asset owner. Camera relocation will be
                                                                                                                                                        tie-ins. Refer to drawing M000705-3-1-PL-070002 for
                                                                                                                                                                                                              designed and implemented by others.
                                                                                                                                                        further details
                                                                                                                                                        Existing blister tactile paving TP1 to be cleaned, inverted
                                                                                                                                                                                                       PO
                                                                                                                                                        and relayed on the existing bedding and foundation. Refer
                                                                                                                                                        to drawing M000705-3-1-PL-070002 for further details  existing location
                                                                                                                                                                                                              Site gate to be designed and implemented
                     FOR CONTINUATION REFER TO VIEWPORT A             CCTV G                        2.95                              SCHEME EXTENTS  G  Existing utility cover to be raised or lowered to suit  REV  25/09/23  Updated following TfL comments  PCG  CHKD  APRVD
                                                                                                                                                                                                              by others
                                                                                                                                                        Existing surfacing to be excavated to tie in to new adjacent
                                                                                                                                                        levels. Refer to site clearance drawing
                                                                                RS
                                                                                                                                                                                                              Proposed cycle ramp
                                                                                                                                                        M000705-3-1-PL-020001 for further details.
                                                                         PO
                                                                                                                                                                                                                                      TB
                                                                                                                                                                                                       B
                                                                                                                                                                                                                                          JT
                                                                                                                                                        proposed levels
                                                                                                                                                                                                        16/06/23
                                                                                                                                                                                                       A
                                                                                                                                                                                                                                  PCG
                                                                                                                                                                                                                                          JT
                                                                                                                                                                                                                                      TB
                                                                                                                                                                                                                     First issue
                                                                                                                                                                                                                                   DRN
                                                                                                                                                                                                         DATE
                                                                                                                                                                                                                REVISION DESCRIPTION / DETAILS
                                                                                                                                                                                                                                      BY
                                                                                                                                                                                                                                   BY
                                                                                                                                                                                                                                          BY
                                                                                                                                                        Existing gully to be raised to new levels
                                                                                                                                                        Traffic cone to be designed and implemented by others
            1.65      G                                    1.00                                                                                         Proposed temporary orange/white 800mm off highway  CLIENT:
                                                                                                                                                        highway pole cone or similar approved, to be designed and
                                                                                                                                                        implemented by others
                                                                                                                                                        Proposed kerb K1 - 300mm wide granite kerb with 125mm
                                       3.25
                                             1.00
                                                                                                                                                        upstand. Refer to drawing M000705-3-1-PL-070001 and
                                                                           1.25
                                                                                                                                                        M000705-3-1-PL-070002 for further details
                                                                                                                                                                                                      JOB TITLE:  ROYAL LONDON
                                                                                                                                                        Proposed kerb K2 - 300mm wide granite kerb with 0mm      HOLBORN VIADUCT
                                        3.25                FARRINGDON STREET                                                                           upstand. Refer to drawing M000705-3-1-PL-070002 for  DRAWING TITLE:
                                                                                                                                                        further details
                                                                                                                                                                                                             HOLBORN VIADUCT PIT LANE
                                                                                                                                                                                                                S278 DETAILED DESIGN
                                                                                                                                                        Proposed kerb K3 - 300mm wide transition granite kerb
                                                                                                                                                        with varying upstand from 0mm to 125mm upstand         GENERAL ARRANGEMENT
                                          29.20                                                                                                                                                       STATUS:
                                                                                                                                                        Proposed road markings (type varies). Refer to drawing  FOR REVIEW & COMMENT
                                                                                                                                                        M000705-3-1-PL-120001 for further details
       VIEWPORT B                                                                                                                                                                                     DRAWING NO:               REV:  SCALE AT A3:
                                                                                                                                                                                                      M000705-3-1-PL-000001     B   1:250
   1   2   3   4   5   6   7   8   9