Page 18 - GLNG Week 01 2023
P. 18

GLNG                          NEWSBASE’S ROUNDUP GLOBAL (NRG)                                          GLNG


       NewsBase’s Roundup Global (NRG)








        NRG              WELCOME to NewsBase’s Roundup Global  FSUOGM: Novatek says Arctic LNG-2 remains
                         (NRG), in which the reader is invited to join  on track for 2023 launch
                         our team of international editors, who provide a  The first train at Novatek’s 20mn tonne per year
                         snapshot of some of the key issues affecting their  Arctic LNG-2 project is still on track to start up
                         regional beats. We hope you will like NRG’s new  in December next year, while the second and
                         concise format, but by clicking on the headline link  third trains should come online in 2024 and
                         for each section the full text will be available as  2026 as initially planned, a project director told
                         before.                              reporters on December 12. There have been
                                                              heightened concerns about whether the time-
                                                              frame for Arctic LNG-2’s development will be
                                                              revised in light of Western sanctions and other
                         AfrOil: BW Energy preparing for 3D study of  fallout from Moscow’s invasion of Ukraine,
                         Kudu field                           although Novatek and Russian authorities have
                         BW Energy (Norway) says it will conduct a 3D  insisted that there are no changes to the existing
                         seismic survey of the Kudu natural gas field off-  lan.
                         shore Namibia in order to identify additional
                         exploration targets and attract a new investment  GLNG: Sempra signs offtake agreement with
                         partner. The Oslo-listed firm revealed in a state-  Port Arthur LNG
                         ment on December 2 that it had signed a con-  Sempra has announced an offtake agreement
                         tract on the collection of 4,600 square km of 3D  with Engie for liquefied natural gas from Sempra’s
                         seismic data from Production Licence 3, an off-  proposed Port Arthur LNG facility. For 15 years,
                         shore block that includes the Greater Kudu area.  Engie will receive some 0.875mn tonnes per year
                                                              of LNG from the Port Arthur LNG Phase I pro-
                         AsianOil: Petronas makes “significant” oil find  ject, on the Gulf of Mexico.
                         off Malaysia
                         Malaysia’s Petronas has reported what it  LatAmOil: Stabroek partner to buy $750mn in
                         describes as a “significant” oil discovery at a well  carbon credits from Guyana
                         off the coast of Sarawak. The find was made at  US-based Hess, a minority shareholder in the
                         the Nahara-1 well at Block SK306, some 150  offshore Stabroek block, has signed an agree-
                         km from Bintulu, where Malaysia’s main LNG  ment with the government of Guyana on the
                         export is located.                   purchase of 37.5mn carbon credits between
                                                              2022 and 2032. The document, which was final-
                         DMEA: TNP, Forcados restarts bring Nigerian  ised at a ceremony witnessed by the company’s
                         oil output up to 1.6mn bpd           CEO John Hess and Guyanese President Irfaan
                         Nigeria has pushed crude oil production up to  Ali, provides for Hess to acquire 2.5mn carbon
                         1.6mn barrels per day thanks to the re-open-  credits per year for the period between 2016 and
                         ing of the Forcados terminal and the partial  2030.
                         resumption of shipments through the Trans-Ni-
                         ger Pipeline (TNP), according to a subsidiary of  MEOG: ADNOC and Petronas sign unconven-
                         Nigerian National Petroleum Co. Ltd (NNPCL).  tional deal
                         Bala Wunti, the head of National Upstream  Abu Dhabi National Oil Co. (ADNOC) this
                         Investment Management Services (NUIMS),  week signed a deal with Petronas that awards the
                         told Arise TV in an interview on December 7  Malaysian firm the first concession for unconven-
                         that output levels had risen by 350,000 bpd due  tional oil development in the Middle East. Under
                         to these developments.               the terms of the agreement, Petronas was granted
                                                              100% operatorship of the six-year exploration
                         EurOil: Neptune has made third oil, gas find in six  phase of the Unconventional Onshore Block 1
                         months                               asset which covers more than 2,000 square km
                         Neptune Energy has made its third oil and gas  in the western Al Dhafra region of Abu Dhabi.
                         discovery in the last six months, in the Norwegian
                         Sea, the Norwegian Petroleum Directorate (NPD)  NorthAmOil: Los Angeles bans new oil wells, to
                         reported on December 9, estimating the size of the  close existing wells
                         find at 6.3mn-22mn barrels of oil equivalent. The  Los Angeles city councillors have voted unan-
                         Calypso discovery well, 14 km north-west of the  imously to ban existing oil wells within city
                         Neptune-operated Draugen field, encountered an  boundaries immediately, and to phase out exist-
                         8-metre gas column and a 30-metre oil column in  ing ones within 20 years. There are 26 oil and
                         the Garm formation, with reservoir quality of “good  gas fields – and some 5,000 wells – within the
                         to very good,” the NPD said.         metropolis, the country’s second-largest.





       P18                                      www. NEWSBASE .com                         Week 01  05•January•2023
   13   14   15   16   17   18   19