Page 13 - MEOG Week 08 2021
P. 13

MEOG                                  PROJECTS & COMPANIES                                            MEOG


       Iran anticipates Khesht




       kick-off in the next year




        IRAN             THE Iranian Central Oil Fields Co. (ICOFC)  Saadatabad oilfields to 30,000 bpd.
                         announced last week that the first phase of   During a recent visit to Khesht, the head of
                         production at the Khesht oilfield on the bor-  the Iranian Parliament’s Energy Committee,
                         der of Iran’s Fars and Bushehr Provinces will  Fereydoun Abbasi, said that the project had
                         be launched by the end of September. ICOFC  reached 90% completion, adding that once the
                         is a subsidiary of the National Iranian Oil Co.  upstream development had been finalised, plans
                         (NIOC).                              are in place to construct a small refinery to con-
                           Speaking to official oil and gas media outlet  vert the field’s output into refined products for
                         Shana, Ramin Hatami, the company’s manag-  local consumption.
                         ing director, said that production would reach
                         20,000 barrels per day (bpd) during the first half  Gas storage
                         of the upcoming Iranian calendar year, which  In related news, ICOFC also announced last
                         begins in March.                     week that gas reproduction capacity from its
                           Hatami said: “The early phase of the field  Sarajeh underground gas storage (UGS) facility
                         will be operational in the first half of next year  near Qom had risen by 17% since March 2020
                         with the launch of three wells, and the produced  compared to the previous Iranian calendar year.
                         oil will be sent to Nargesi Centre via a 10-inch   The company’s production director, Ahmad
                         [254-mm] pipeline.” He added that a total of five  Rajabi, said that 1.01bn cubic metres of gas has
                         wells would be required to complete the field’s  been reproduced from storage in the last 11
                         development.                         months.
                           Khesht is being developed by ICOFC subsid-  Sarajeh is one of Iran’s two main gas stor-
                         iary South Zagros Oil and Gas Production Co., a  age facilities, the other being Shourijeh in the
                         company based in Shiraz.             north-eastern province of Khorasan Razavi, 124
                           Meanwhile, the ICOFC website lists achiev-  km south of Tehran. In mid-2020, the National
                         ing 30,000 bpd of output at Khesht and develop-  Iranian South Oil Co. (NISOC) said that com-
                         ment of “transmission to Gonaveh manifold for  bined reproduction from the two sites increased
                         export” as one of the company’s active projects.  by 33% during the March 2019-March 2020 cal-
                           Qeshm Oil and Energy Industries Devel-  endar year compared to the one prior.
                         opment Co. (OEID) previously carried out   As Iran nears completion of the final offshore
                         extensive contracting work at Khesht includ-  and onshore phases of the supergiant South Pars
                         ing shooting 2D and 3D seismic, studies for  gas field, Iran’s portion of the world’s largest gas
                         improved and enhanced oil recovery (IOR/  deposit, Tehran has prioritised the expansion of
                         EOR), well workovers and the construction of  its gas storage network.
                         pipelines connecting the field to the Nargesi   Production from the 23 operational offshore
                         central processing facility (CPF) and the Shiraz  phases was reported by Oil Minister Bijan Zan-
                         refinery.                            ganeh in September to have reached 700mn
                           This also included work to enable the  cubic metres per day, up from 280mcm per day
                         expansion of production at the Sarvestan and  in 2013.™






























       Week 08   24•February•2021               www. NEWSBASE .com                                             P13
   8   9   10   11   12   13   14   15   16   17   18