Page 21 - Spring 2020 Digital inLEAGUE Volume 43 Number 02
P. 21

Civic Theatre, Allentown, PA
                                                                                         auditorium after renovation © Aislinn
                                                                                         Wiedele | Photo courtesy Mills +
                                                                                         Schnoering Architects








































                               Civic Theatre, Allentown, PA
                               lobby after renovation © Aislinn
                               Wiedele | Photo courtesy Mills +
                               Schnoering Architects



        including cinema renovations for Civic’s nearby       design team to find ways to capture and repurpose
        Theatre514.                                           existing space to accommodate Civic Theatre’s
        The scope of architectural work included design for   evolving needs. For example, an underutilized office
        total building systems upgrades; box office, lobby,   area adjacent to the lobby became a new box office
        and auditorium renovations; new auditorium seating;   and patron lounge. Original organ lofts transformed
        restoration of historic finishes; new and upgraded    into new dressing rooms and technical space.
        theatrical sound and lighting systems; accessibility   An auditorium control booth was repurposed for
        and code improvements; a new concession area          concessions.
        and patron lounge; MEP system replacements and a      Prior to beginning the project, Civic Theatre strategized
        fully automatic fire suppression system; and selective   its objectives, identified a scope of work aligned with
        exterior brick and façade repairs. Significant historic   its mission, and assembled a team of professionals
        preservation work included repair and restoration of   including an architecture firm experienced with historic
        the ornate ceiling and side wall decorative plaster,   theatre renovations. Additional consultants included
        replication of missing lattice plaster, and refurbishment  a construction manager, cost estimator, structural
        of original wall sconces. Much of the original Art Deco  and mechanical engineers, theatrical/acoustics
        detailing remained intact and was conserved during    consultant, lighting designer, materials conservator,
        the project, including discovery and restoration of a   and decorative paint/plaster conservator.
        dramatic back-wall mural that had been hidden for     The award-winning results have increased attendance
        decades.                                              and sparked greater interest in Civic Theatre’s
        Careful study during the planning phase enabled the  programming and community engagement.


                                                                                    May 2020   INLEAGUE  | PAGE 19
   16   17   18   19   20   21   22   23   24   25   26