Page 3 - QR CIMAR PADDLE MIXER
P. 3

For technical questions and replacement parts, please call +65 6758 1211 / 6643 1212

Thank you very much for choosing a CIMAR Product!
It is important that you read the entire manual to become familiar with this product before you begin using it.

This machine is designed for certain applications only. Teesin Machinery (Pte) Ltd recommends this machine
is not modified and/or used for any application other than that for which it was designed. If you have any
questions relative to a particular application, DO NOT use the machine until you have first contacted Teesin
Machinery (Pte) Ltd to determine if it can or should be performed on the product.

INTENDED USE

  INSERT THE PROPER USE FOR THE TOOL

TECHNICAL SPECIFICATIONS

Drum Capacity     220L
Batch Capacity    1-1/2 to 2 Bags of cement
Wheel to Wheel
Measurement       37-5/8” Long
Tires
Drive & Clutch    Qty. 2 / 60 PSI (Cold) / 4.80/400-12 / Maximum Load: 355 kg Each
Drum Speed        V-Belt to Gears / Front Post Hand Clutch
Drum Opening      2-Speed Operation (20 & 36 RPM)
Drum Lock         24-1/8”L x 23-3/4”W
Road              Spring Loaded Handle
                  Not for Highway Use
Engine
                  5.5 HP Air-cooled Diesel Powered

Electric Motor    3kW 380V 50Hz 3-phase Direct Drive

Operating Weight  254 kg (Empty)

                                                   IMPORTANT!
This product requires oil and fuel to be added before starting. Attempting to start the

                 Engine without oil will ruin the Engine and void the warranty.

GENERAL SAFETY RULES

        WARNING: Read and understand all instructions. Failure to follow all instructions listed below may

result in electric shock, fire and/or serious injury.

        WARNING: The warnings, cautions, and instructions discussed in this instruction manual

cannot cover all possible conditions or situations that could occur. It must be understood by the operator
that common sense and caution are factors which cannot be built into this product, but must be supplied by the
operator.

                                                                                Page 2 of 10
   1   2   3   4   5   6   7   8