Page 12 - QR CIMAR MULTI-GRINDER
P. 12
CMG/TEESIN/MAN/01/15 Compile by CJ
4. Pre-Operation and Operation Instructions
4.1) Pre-Operation Instructions
CAUTION! Turn the Switch to “OFF” position and unplug the electrical connection
prior to performing any service, maintenance, or cleaning.
4.2) Operation Instructions
Starting the Multi Grinder:
1. Before starting the multi grinder, make sure to check there is no damage on the
power socket. (refer to fig 4-1)
2. With assistance, set the multi grinder on the ground. Use with caution when
running the multi grinder and maintain control at all times.
3. Make sure the switch is in its “ON” position (fig 4-2). Then, adjust the elevating
lever to the desire level and hold firmly onto the handle. (fig 4-3).
4. Push the “OFF” switch (fig 4-4) to stop the multi grinder and disconnect the
power cable when not in use.
Fig 4-1 Fig 4-2 Fig 4-3
Fig 4-4
For technical questions, please call +65 - 66431213 10
For Products Enquiry, please call +65 - 67581211