Page 12 - QR CIMAR MULTI-GRINDER
P. 12

CMG/TEESIN/MAN/01/15                                                                Compile by CJ

4. Pre-Operation and Operation Instructions

4.1) Pre-Operation Instructions

    CAUTION! Turn the Switch to “OFF” position and unplug the electrical connection
prior to performing any service, maintenance, or cleaning.

4.2) Operation Instructions

Starting the Multi Grinder:

    1. Before starting the multi grinder, make sure to check there is no damage on the
         power socket. (refer to fig 4-1)

    2. With assistance, set the multi grinder on the ground. Use with caution when
         running the multi grinder and maintain control at all times.

    3. Make sure the switch is in its “ON” position (fig 4-2). Then, adjust the elevating
         lever to the desire level and hold firmly onto the handle. (fig 4-3).

    4. Push the “OFF” switch (fig 4-4) to stop the multi grinder and disconnect the
         power cable when not in use.

Fig 4-1               Fig 4-2                                              Fig 4-3

Fig 4-4

                      For technical questions, please call +65 - 66431213           10
                      For Products Enquiry, please call +65 - 67581211
   7   8   9   10   11   12   13   14   15   16   17