LOCATION: Charlotte, NC
OWNER: Lincoln Harris
GENERAL CONTRACTOR: Gilbane Building
Company
PROJECT PROFILES
BUDGET: $5.3M
Rosendin is the electrical contractor for an 18-story
workplace tower with four levels of parking and 13 levels
of office space. The building is part of Legacy Union, a
two-block, 10-acre site in Uptown Charlotte, NC. Located
near the Bank of America Stadium, the development
includes four towers with Class A office and retail space.
Two Legacy Union totals 433,970 square feet and includes
8,100 square feet of retail space, 313,300 square feet of
HAPUNA BEACH RESIDENCES office space, and a 110,000 square foot parking garage.
The project is built to achieve LEED-Gold certification.
LOCATION: South Kohala, HI
"These projects can feel like such a grind that you often
OWNER: West Point Investment Corporation get tunnel vision as you work around one obstacle after
another. And then one day, you are just walking down
GENERAL CONTRACTOR: Metzler Contracting Co. LLC
the street, you turn around and there is the finished
BUDGET: $8.9M product looking awesome. A tip of the hard hat had to
the entire Tomcat Team for their tenacity in pushing this
Design-Build Renovation of (3) existing structures to convert of Hotel Guestroom bays to (68) Luxury Residential Low-Rise important Project to a successful completion."
Units, including approximately 110,000 square feet of residential space and an additional 40,000 square feet of circulation - Rick Provost, Division Manager
and common areas. Scope of work for Rosendin includes all electrical design new utility service switchgear, electrical TOMCAT
distribution, lighting and lighting control, emergency power system, Fire Life Safety, prefabrication of unit load centers and
branch circuiting.
PROJECT PROFILES LOCATION: Baltimore, MD
OWNER: Maryland Aviation Administration
LOCATION: Aiea, Oahu, HI GENERAL CONTRACTOR: Haskell Company
OWNER: University of Hawaii BUDGET: $5.7M
GENERAL CONTRACTOR: Ralph S. Inouye Co.
This large 202,850 SF project comprised a mixture of office
BUDGET: $2.5M and warehouse space, with a large number of loading docks
in the warehouse space. The amount of electric work to
In collaboration with General Contractor Ralph S. Inouye complete in a compressed schedule was a daunting task.
Co., Ushijima Architects, Inc., and a team of subcontractors,
Rosendin is creating a modern and sustainable space that During the course of the project, the owner determined that
compliments the existing facility and embraces local culture. the needs were greater than anticipated and increased the
Rosendin has tapped into more than 50 years of design- scope of work. Rosendin employed 80 field employees on
build experience across a diverse client portfolio to bring the job, doubling the average number of employees on-site, PROJECT PROFILES
innovative ideas to the project. in order to complete this project on time. This made it a
large task to control the safety while work continued 14-16
"After building landmark projects on Hawaii's islands for hours a day, 7 days a week for two (2) months.
over 6 years, our engineers are thrilled to collaborate with
construction partners on the design of the second phase of In the last month of the project, a roller floor was scheduled
the Culinary Institute of the Pacific. Using resources such as for installation to assist in moving packages once the facility
UH CULINARY 3D BIM models and Lean Construction Tools, our engineers was open. Rosendin completed all of the high work prior
on the Design-Build Team integrated safety, scheduling, and
to the floor installation as lifts and ladders would not be
efficiencies into the design that will help provide flexibility for AFCO AIR CARGO usable after the floor was installed. The team used many
INSTITUTE future expansion." - Ryan Chun, Preconstruction Manager prefabricated systems for lighting to increase efficiencies
of scheduled electrical activities. Additionally, Rosendin had
FACILITY BWI the lighting vendor provide all of the light fixture whips with
PROJECT PROFILES BUILDING H the fixtures. This project was completed on time and under
budget.