UC DAVIS EDWARDS FAMILY                                      SHORELINE GATEWAY TOWER


 ATHLETICS CENTER

 LOCATION: Davis, CA  LOCATION: Los Angeles, CA
 CLIENT: Regents of the University    CLIENT: Ledcor Properties
 of California, Davis  GENERAL CONTRACTOR: Build Group
 GENERAL CONTRACTOR: Hunt Construction    The 35-story Shoreline Gateway Tower is the tallest
 Group, Inc.  building in Long Beach, CA and also the city's
          first LEED-ND Gold project. The building consists
 BUDGET: $7 Million                                                                                                      PROJECT PROFILES
          of five floors of underground parking, a ground
 The Edwards Family Athletics Center includes   floor comprised of retail, community amenities
 training facilities, an 8,000 square foot sports   and a lobby, and 31 private residence floors with
 medicine center, a home for academic   315 "ultra luxury" units with the availability for
 support, and the Aggie EVO System, athletic   designated EV Chargers. The building is equipped
 offices for multiple sports programs.  with WiFi throughout, a sound-system, and is
          Bluetooth ready, along with media areas all
 The Center is approximately 50,000 square   completed by Rosendin's Low Voltage/AV Team.
 feet and is located adjacent to Bob Biggs
 Field — a natural grass practice area
 for use by all 25 athletic programs.








 PROJECT PROFILES






 RESTON GATEWAY  LIFEMOVES MOUNTAIN VIEW PROJECT

 LOCATION: Reston, VA                                                     LOCATION: Mountain View, CA
 CLIENT: Confidential                                                     CLIENT: LifeMoves
 GENERAL CONTRACTOR: Clark Construction Group                             GENERAL CONTRACTOR: XL Construction
 BUDGET: $27 Million                                                      LifeMoves Mountain View is a
                                                                          welcoming, dignified, and safe interim
 Rosendin is performing electrical construction                           housing community that offers a
 services for a tower in the Reston Gateway                               private modular container unit for
 development. The new development consists                                each household – whether a family,
 of two office towers; one 28-story building, and                         couple, or single adult experiencing
 one 20-story building. The project, approximately                        homelessness – while providing
 731,000 square feet in size, consists of the                             intensive case management and support
 tenant build-out for a new DC headquarters                               services designed to return people to
 for a confidential client. The project consists of                       stability. Rosendin provided electrical
 19 floors of the 28-story structure, new 2.5M                            services for 46 modular containers.
 generators, complicated systems including lighting
 controls, audiovisual, and telecommunications.
 Rosendin's scope of work includes electrical,
 lighting control and fire alarm complete
 installs, telecommunication, and security
 pathways. Additionally, Rosendin participated
 in preconstruction services providing budgets
 during the early design development phase,
 lighting control costs and performance reviews,
 scheduling, and prefabrication planning.