UC DAVIS EDWARDS FAMILY SHORELINE GATEWAY TOWER
ATHLETICS CENTER
LOCATION: Davis, CA LOCATION: Los Angeles, CA
CLIENT: Regents of the University CLIENT: Ledcor Properties
of California, Davis GENERAL CONTRACTOR: Build Group
GENERAL CONTRACTOR: Hunt Construction The 35-story Shoreline Gateway Tower is the tallest
Group, Inc. building in Long Beach, CA and also the city's
first LEED-ND Gold project. The building consists
BUDGET: $7 Million PROJECT PROFILES
of five floors of underground parking, a ground
The Edwards Family Athletics Center includes floor comprised of retail, community amenities
training facilities, an 8,000 square foot sports and a lobby, and 31 private residence floors with
medicine center, a home for academic 315 "ultra luxury" units with the availability for
support, and the Aggie EVO System, athletic designated EV Chargers. The building is equipped
offices for multiple sports programs. with WiFi throughout, a sound-system, and is
Bluetooth ready, along with media areas all
The Center is approximately 50,000 square completed by Rosendin's Low Voltage/AV Team.
feet and is located adjacent to Bob Biggs
Field — a natural grass practice area
for use by all 25 athletic programs.
PROJECT PROFILES
RESTON GATEWAY LIFEMOVES MOUNTAIN VIEW PROJECT
LOCATION: Reston, VA LOCATION: Mountain View, CA
CLIENT: Confidential CLIENT: LifeMoves
GENERAL CONTRACTOR: Clark Construction Group GENERAL CONTRACTOR: XL Construction
BUDGET: $27 Million LifeMoves Mountain View is a
welcoming, dignified, and safe interim
Rosendin is performing electrical construction housing community that offers a
services for a tower in the Reston Gateway private modular container unit for
development. The new development consists each household – whether a family,
of two office towers; one 28-story building, and couple, or single adult experiencing
one 20-story building. The project, approximately homelessness – while providing
731,000 square feet in size, consists of the intensive case management and support
tenant build-out for a new DC headquarters services designed to return people to
for a confidential client. The project consists of stability. Rosendin provided electrical
19 floors of the 28-story structure, new 2.5M services for 46 modular containers.
generators, complicated systems including lighting
controls, audiovisual, and telecommunications.
Rosendin's scope of work includes electrical,
lighting control and fire alarm complete
installs, telecommunication, and security
pathways. Additionally, Rosendin participated
in preconstruction services providing budgets
during the early design development phase,
lighting control costs and performance reviews,
scheduling, and prefabrication planning.